| CAL FIRE FINAL INSPE | CHRIS BOYD | | | |
|
| PW FINAL | PWROADS | | | |
|
04/18/2024 | ENV HEALTH RELEASE | DANIEL GRATTAN | PASS | | |
|
04/26/2024 | UNDER SLAB PLUMBING | WOODY TOWNSEND | FAIL | | 4/26/2024 3:44:45 PM
Provide 10' head test. Plumbing not inspected.
|
|
04/26/2024 | SETBACKS | WOODY TOWNSEND | FAIL | | 4/26/2024 3:44:53 PM
1. Locate property line monuments and pull sting.
2.Provide erosion control measures at slope side.
3. Provide 10' head test on plumbing. Plumbing not inspected until on test.
|
|
05/01/2024 | UNDER SLAB PLUMBING | SCOTT YOUNG | PASS | eTRAKiT Inspection Request | 4/29/2024 2:47:11 PM
4/29/2024 2:47 PM ELI ENGINEERING INC
Contact Name: ELI ENGINEERING INC
Site Address: 13930 CRESTON RD
Phone: 2096134201
e-Mail: EFRENSOSA@ME.COM
5/1/2024 6:20:45 AM
syoung changed Inspection Type from FORMS/STEEL/HOLDOWNS to UNDER SLAB PLUMBING
5/1/2024 6:22:27 AM
Also approved setbacks.
|
|
05/02/2024 | FOUNDATION/FOOTINGS | RICHARD PRATT | FAIL | | 5/2/2024 5:19:32 AM
rpratt changed Inspection Date/Time from 05/02/2024 08:00 AM to 05/02/2024 08:30 AM
5/2/2024 9:45:22 AM
1. Adjust rebar to provide proper 1.5' clearance to forms, checked throughout, full perimeter.
2. Install and tie slab ties to the rebar mat and the footing rebar.
3. Recall inspection when completed
|
|
05/02/2024 | FOUNDATION/FOOTINGS | RICHARD PRATT | PASS | | 5/2/2024 5:44:25 PM
Forms footings and rebar- Approved
|
|
05/02/2024 | PRE-SLAB | RICHARD PRATT | PASS | | 5/2/2024 5:44:32 PM
Prepour slab - Approved
|
|
05/03/2024 | UNDER SLAB PLUMBING | RICHARD PRATT | PASS | | 5/3/2024 4:37:22 AM
rpratt changed Inspection Date/Time from 05/03/2024 08:00 AM to 05/03/2024 2:00 PM
5/3/2024 5:04:04 AM
rpratt changed Inspection Date/Time from 05/03/2024 02:00 PM to 05/03/2024 2:30 PM
5/3/2024 3:50:00 PM
All correction items completed
|
|