05/19/2024
9:30 AM

Butte County
Department of Development Services

Main: 530.552.3700
Automated Inspection Phone Line: 530.538.4365
Online Inspection Scheduling / Payments / Renewals:
ButteCounty.net/DDS

 
Permit No. B22-0159 Permit Type   RESIDENTIAL Site Address   13 CHERRY LN
OROVILLE, CA 95965
Applied   01/19/2022 Applicant   CHAIN KHERA
Approved   02/07/2023 Owner   CHAIN KHERA
Issued   02/09/2023 Contractor   O/B
Parent Permit No.   Description   NSF (1311) GAR (440) OPEN (54) COVD (1805)
  Notes  
 
  Date of Inspection Inspection Type Inspector Result Remarks Notes

 05/31/2023FOUNDATION/FOOTINGSLARRY AKERSFAILPM REQUEST - DR APT 9AM6/1/2023 7:17:05 AM 1) expose all plumbing and provide a 10 foot head then have a inspection before continuing 2) provide compaction for fill 3) provide approved plot plans and survey property lines. (House appears to be too close to cherry lane) 4) will need moister barrier installed 5) rebar has to be held 3 inches from earth Talked to owner, need survey to verify set backs and if in correct location will need to expose plumbing and water test

 06/12/2023SETBACKSCHRISTOPHER ROBERTSPASS067180-01 - Scheduled by IVR.6/12/2023 10:39:29 AM croberts changed Inspection Type from UNDER SLAB PLUMBING to SETBACKS 6/12/2023 3:01:04 PM Setbacks - approved

 06/13/2023SETBACKSRANDALL SMITHCANCELLED067180-03 - Scheduled by IVR.6/13/2023 2:02:27 PM Setbacks was passed on 6/12/2023 by CR 6/13/2023 2:10:50 PM Setbacks was passed on 6/12/2023 by CR 6/13/2023 2:12:04 PM Setbacks was passed on 6/12/2023 by CR 6/13/2023 2:12:20 PM Setbacks was passed on 6/12/2023 by CR

 06/13/2023FOUNDATION/FOOTINGSRANDALL SMITHFAIL067180-02 - Scheduled by IVR.6/13/2023 2:10:54 PM Complete prior foundation footings correction from 6/1/2023 Provide an approved set of plans on site. Provide full 12 inch footings in undisturbed soil. Complete foundation rebar and provide 3 inches clearance to bottom of footing. Rebar is not properly lapped. Missing top rebar and corners on bottom. Clean footings of rock, trash and debris. Provide a compaction report. Sleeve all through plumbing penetrations through footings with piping 2 sizes larger than pipe penetrating. Provide a ten ft head of water for testing the plumbing. Install all required hold downs as per plans Install all anchor bolts as per plans. Pull string on property lines to check setback. Call reinspection when ALL corrections are completed. 6/13/2023 2:12:24 PM Complete prior foundation footings correction from 6/1/2023 Provide an approved set of plans on site. Provide full 12 inch footings in undisturbed soil. Complete foundation rebar and provide 3 inches clearance to bottom of footing. Rebar is not properly lapped. Missing top rebar and corners on bottom. Clean footings of rock, trash and debris. Provide a compaction report. Sleeve all through plumbing penetrations through footings with piping 2 sizes larger than pipe penetrating. Provide a ten ft head of water for testing the plumbing. Install all required hold downs as per plans Install all anchor bolts as per plans. Pull string on property lines to check setback. Call reinspection when ALL corrections are completed.

 06/15/2023ROUGH PLUMBINGRANDALL SMITHFAIL6/15/2023 4:35:02 PM Previous corrections not completed Repair leak and provide 10ft head of water to test plumbing. Sleeve through penetrations through footings. Provide plumbing for kitchen sink. Cannot wet vent through the washing machine stand pipe. Call for reinspection when corrections are completed

 06/26/2023ROUGH PLUMBINGRAYMOND SANDOVALFAIL W/RE-INSP FEE6/26/2023 9:48:05 AM Previous corrections items not completed. Please pay reinspection fee prior to recalling for inspection

 06/30/2023UNDER SLAB PLUMBINGLARRY AKERSFAIL W/RE-INSP FEEHANDWRITTEN CORRECTIONS ONLY6/30/2023 10:54:24 AM 1) Can not run plumbing in bottom of footing 2) need to slope 1/4 inch per foot towards flow (half of system sloping wrong way. 3) wrong fittings need sweep fitting and not San tees 4) verify property lines 5) need compaction report See past 2 inspections and make all corrections Compaction report needs to be verified before any other work done. Compaction report needs to be done before any other work

 06/30/2023FOUNDATION/FOOTINGSLARRY AKERSFAIL W/RE-INSP FEEHANDWRITTEN CORRECTIONS ONLY6/30/2023 10:54:28 AM 1) need compaction report 2) need to complete forms See all other corrections from past and correct. 7/3/2023 10:06:11 AM REMOVED REINSPECTION FEE. DUPLICATE CHARGE.

 07/13/2023UNDERGROUND PLUMBINGWOODY TOWNSENDCANCELLED7/13/2023 1:35:59 PM Called owner and informed him no further instructions will be done until all outstanding reinspection fees are payed. Inspection is canceled.

 07/14/2023UNDER SLAB PLUMBINGRAYMOND SANDOVALPASSHANDWRITTEN CORRECTIONS ONLY7/14/2023 9:34:52 AM Compaction report attached. Previous corrections completed

 07/21/2023FOUNDATION/FOOTINGSRAYMOND SANDOVALCANCELLED

 07/24/2023FOUNDATION/FOOTINGSRAYMOND SANDOVALFAIL7/24/2023 1:49:33 PM Not ready for inspection. install all anchor bolts, hold downs, Raise wire mat off of subgrade . Install ufer Maintain required clearance from rebar to earth. Not a complete list until all components are in place

 08/07/2023FOUNDATION/FOOTINGSRAYMOND SANDOVALFAIL W/RE-INSP FEE8/7/2023 1:22:35 PM 1. Footing to be 12' wide per approved plans. 2. Complete installation of all rebar per plan. 3. install anchor bolts per plan, minimum 2 per sill plate, no more than 72' apart and within 12' of sill plate break. 4. Clean out bottom of footings where dirt has caved in or trash has blown in. 5. Wrap plumbing pipes with approved materials. (Pink insulation not approved.)

CAL FIRE FINAL INSPECHRIS BOYD

 08/18/2023FOUNDATION/FOOTINGSCHRISTOPHER ROBERTSFAIL W/RE-INSP FEE8/18/2023 11:34:34 AM 1. Missing required 8 hold downs for footings as per plans. 2. Clean all debris, trash, sand, rock, and mud from footings throughout. 3. Tie up bottom rebar for north garage wall. (Sitting on ground) 4. Provide a 10' head of water for leak test. **Builder stated that homeowner refuses to share the plan set for this project. Builders are going off of what homeowner tells them to do. ** Informed builders of work needed to get done. Showed them plans on my iPad to further direct them in the right direction. Pay re-inspection fee, complete work, and call for re-inspection.

 08/22/2023FOUNDATION/FOOTINGSRICHARD PRATTFAIL W/RE-INSP FEE8/22/2023 7:04:17 AM rpratt changed Inspection Date/Time from 08/22/2023 08:00 AM to 08/22/2023 09:00 AM 8/22/2023 12:08:18 PM Complete previous correction items prior to calling for re-inspection Finish wrapping DWV where it will be in contact with the concrete. Install sleeve over waste line in the bottom and through the footing Complete the installation of anchor bolts throughout. No ufer ground per plan, electrician will drive 2 ground rods ** 10' head of water test - Approved ** Pay the-inspection fee and recall in

 08/22/2023UNDER SLAB PLUMBINGRICHARD PRATTPASS8/22/2023 12:08:33 PM 10' head of water test for DWV - Approved

 08/23/2023FOUNDATION/FOOTINGSRAYMOND SANDOVALPASS8/23/2023 8:31:14 AM Previous corrections complete.

 01/23/2024PROGRESS INSPECTIONRANDALL SMITHNOT REQUIREDUNAVAILABLE PRIOR TO 10AM1/23/2024 11:44:37 AM Concrete foundation shows evidence of cold joints, exposed aggregate and lack of mechanical vibration. See attached photos. Provide a letter of approval or repair from the Engineer of record for the defects in the concrete foundation.

 03/25/2024ROOF NAILWOODY TOWNSENDFAIL W/RE-INSP FEEPM PLEASE3/25/2024 12:23:19 PM Provide a letter of approval or repair from the Engineer of record for the defects in the concrete foundation. This was requested on 1/23/24 at last inspection. No further inspections will be done until engineers approval of foundation. Pay re inspection fee prior to rescheduling additional inspections.

 04/24/2024ROOF NAILSCOTT YOUNGFAIL W/RE-INSP FEE4/24/2024 9:00:13 AM Note: EOR has approved foundation, Letter is en-route to Building Department. 4/25/2024 5:41:29 AM Showed up to inspection at 11:45 Walked the house, no one onsite. Plans not onsite. Called out that I was here,numerous trailers on the property. No one came out. Left card at front door. Reinspection fee added.

 04/26/2024ROOF NAILCHRISTOPHER ROBERTSFAIL4/26/2024 10:46:45 AM 1. Provide truss calcs on site. 2. Provide mechanical connections on all trusses with H1 straps or equal. 3. Missing gable end bracing on both ends. 4. Remove all shiners from roof throughout and re-nail. ** Roof nailing needs to be inspected. Complete work and call for re-inspection.

 04/30/2024ROOF NAILRANDALL SMITHCANCELLEDPM APPT REQUESTED4/30/2024 3:46:14 PM Received text notification of cancellation 8:46 am 4/30/2024 5:32:55 PM Received text notification of cancellation 8:46 am 4/30/2024 5:36:21 PM Received text notification of cancellation 8:46 am 4/30/2024 5:36:46 PM Received text notification of cancellation 8:46 am 4/30/2024 5:37:11 PM Received text notification of cancellation 8:46 am 4/30/2024 8:41:33 PM Received text notification of cancellation 8:46 am

 05/02/2024ROOF NAILSCOTT YOUNGPARTIAL5/2/2024 6:21:33 AM This was a partial approval. Walked the roof for roof nailing- Approved. Ok to cover roof. A-35's required at all three gable ends Truss bracing required at Fau box out in trusses Missing strap at drag truss ( garage to house tie in., ) Place double studs under strap.