05/07/2024
5:31 AM

Butte County
Department of Development Services

Main: 530.552.3700
Automated Inspection Phone Line: 530.538.4365
Online Inspection Scheduling / Payments / Renewals:
ButteCounty.net/DDS

 
Permit No. B22-2208 Permit Type   RESIDENTIAL Site Address   3963 HOFFMAN RD
CONCOW, CA 95965
Applied   07/06/2022 Applicant   JUSTIN FORRESTER
Approved   08/18/2022 Owner   FARRIS KATHRYN F LIVING TRUST
Issued   08/19/2022 Contractor   S R M CONTRACTING
Parent Permit No.   Description   REPL MH PFS (1056) 433A - CAMP FIRE
  Notes  
 
  Date of Inspection Inspection Type Inspector Result Remarks Notes

 12/02/2022TIE-DOWN SYSTEM/SOFTRICHARD PRATTCANCELLED063754-04 - Scheduled by IVR.12/2/2022 8:00:41 AM Rpratt changed Inspection Date/Time from 12/02/2022 12:00 PM to 12/02/2022 10:30 AM 12/2/2022 12:18:16 PM Canceled- Xi2's we're not delivered.

 12/02/2022BLOCKING/UNDERPINNINRICHARD PRATTPASS063754-03 - Scheduled by IVR.12/2/2022 8:00:46 AM Rpratt changed Inspection Date/Time from 12/02/2022 12:00 PM to 12/02/2022 10:30 AM 12/2/2022 12:18:21 PM Blocking - Approved

 12/02/2022SETBACKSRICHARD PRATTPASS063754-02 - Scheduled by IVR.12/2/2022 8:00:51 AM Rpratt changed Inspection Date/Time from 12/02/2022 12:00 PM to 12/02/2022 10:30 AM 12/2/2022 12:18:26 PM Setbacks checked and Approved

 12/02/2022CONTINUITY TESTRICHARD PRATTPASS063754-01 - Scheduled by IVR.12/2/2022 8:00:56 AM Rpratt changed Inspection Date/Time from 12/02/2022 12:00 PM to 12/02/2022 10:30 AM 12/2/2022 12:18:31 PM Continuity test completed and Approved

 12/02/2022TAG ELECTRICRICHARD PRATTPASS12/2/2022 12:18:52 PM New Power pole, MSP and meter release - Approved

 12/20/2022UNDERGROUND ELECTRICCHRISTOPHER ROBERTSCANCELLED064240-05 - Scheduled by IVR.12/20/2022 6:08:35 AM croberts changed Inspection Date/Time from 12/20/2022 08:00 AM to 12/20/2022 09:00 AM 12/20/2022 9:32:46 AM Not ready

 12/20/2022MANOMETER TESTCHRISTOPHER ROBERTSCANCELLED064240-04 - Scheduled by IVR.12/20/2022 6:08:40 AM croberts changed Inspection Date/Time from 12/20/2022 08:00 AM to 12/20/2022 09:00 AM 12/20/2022 9:32:51 AM Not ready

 12/20/2022UNDERGROUND WATER PICHRISTOPHER ROBERTSCANCELLED064240-03 - Scheduled by IVR.12/20/2022 6:08:45 AM croberts changed Inspection Date/Time from 12/20/2022 08:00 AM to 12/20/2022 09:00 AM 12/20/2022 9:32:57 AM Not ready

 12/20/2022SEWER(PIPE/TEST/TAP)CHRISTOPHER ROBERTSCANCELLED064240-02 - Scheduled by IVR.12/20/2022 6:08:50 AM croberts changed Inspection Date/Time from 12/20/2022 08:00 AM to 12/20/2022 09:00 AM 12/20/2022 9:33:03 AM Not ready

 12/20/2022TIE-DOWN SYSTEM/SOFTCHRISTOPHER ROBERTSCANCELLED064240-01 - Scheduled by IVR.12/20/2022 6:08:55 AM croberts changed Inspection Date/Time from 12/20/2022 08:00 AM to 12/20/2022 09:00 AM 12/20/2022 9:33:08 AM Not ready

 12/30/2022MANOMETER TESTRICHARD PRATTPASS064372-05 - Scheduled by IVR.12/30/2022 6:07:43 AM rpratt changed Inspection Date/Time from 12/30/2022 08:00 AM to 12/30/2022 10:30 AM 12/30/2022 10:42:23 AM Manometer test completed and Approved

 12/30/2022UNDERGROUND WATER PIRICHARD PRATTPASS064372-04 - Scheduled by IVR.12/30/2022 6:07:48 AM rpratt changed Inspection Date/Time from 12/30/2022 08:00 AM to 12/30/2022 10:30 AM 12/30/2022 10:42:29 AM Water supply trench and piping inspection- Approved

 12/30/2022SEWER(PIPE/TEST/TAP)RICHARD PRATTPARTIAL064372-03 - Scheduled by IVR.12/30/2022 6:07:53 AM rpratt changed Inspection Date/Time from 12/30/2022 08:00 AM to 12/30/2022 10:30 AM 12/30/2022 10:42:34 AM Power outage so no water - Ok to backfill, proper slope observed.

 12/30/2022UNDERGROUND ELECTRICRICHARD PRATTPASS064372-02 - Scheduled by IVR.12/30/2022 6:07:58 AM rpratt changed Inspection Date/Time from 12/30/2022 08:00 AM to 12/30/2022 10:30 AM 12/30/2022 10:42:39 AM Electric trench and conduit - Approved

 12/30/2022TIE-DOWN SYSTEM/SOFTRICHARD PRATTPASS064372-01 - Scheduled by IVR.12/30/2022 6:08:03 AM rpratt changed Inspection Date/Time from 12/30/2022 08:00 AM to 12/30/2022 10:30 AM 12/30/2022 10:42:45 AM Permanent foundation system installation- Approved

 01/31/2023GAS TESTCHRISTOPHER ROBERTSPASS064909-02 - Scheduled by IVR.1/31/2023 6:43:54 AM croberts changed Inspection Date/Time from 01/31/2023 08:00 AM to 01/31/2023 12:30 PM 1/31/2023 2:11:29 PM Gas test - Approved

 01/31/2023SEWER(PIPE/TEST/TAP)CHRISTOPHER ROBERTSCANCELLED064909-01 - Scheduled by IVR.1/31/2023 6:43:58 AM croberts changed Inspection Date/Time from 01/31/2023 08:00 AM to 01/31/2023 12:30 PM

 03/15/2023SEWER(PIPE/TEST/TAP)CHRISTOPHER ROBERTSCANCELLED065553-01 - Scheduled by IVR.

 04/04/2023**PERMIT FINALWOODY TOWNSENDCANCELLED065831-01 - Scheduled by IVR.

 03/20/2023CAL FIRE FINAL INSPETROY HANDPASS3/20/2023 3:24:13 PM Needs address on residence. 4/5/2023 9:14:48 AM Has posted an address on the residence.

 04/12/2023**PERMIT FINALCHRISTOPHER ROBERTSFAIL066006-01 MSG! -Msg! Scheduled by IVR.4/12/2023 6:48:00 AM croberts changed Inspection Date/Time from 04/12/2023 08:00 AM to 04/12/2023 12:00 PM 4/12/2023 2:56:52 PM 1. Strap HVAC unit to pad with at least 2 straps. 2. Seal off line set entry to MH 3. Insulate outdoor water lines. 4. Repair crack down marriage line inside MH. 5. Install anti-tip device for range. 6. Caulk around all toilets. 7. Replace receptacle in office (not working) 8. EV health approval required. Complete work and call for re-inspection.

 04/12/2023SEWER(PIPE/TEST/TAP)CHRISTOPHER ROBERTSPASS4/12/2023 2:58:38 PM Sewer (pipe/test/tap) - approved

 04/25/2023433APERMIT CENTERPASSREC DEED AND MCO

 05/02/2023ENV HEALTH RELEASEPAUL THAOPASS7/14/2022 3:26:14 PM Hold for total and fecal coliform water well results IF well head was damaged during fire. 5/2/2023 8:43:16 AM Passing campfire septic system report and passing well water report received. Pass

 05/17/2023**PERMIT FINALCHRISTOPHER ROBERTSPASS5/17/2023 1:54:34 PM Prior corrections have been completed. Permit final - Approved