Permit No. B22-0795 Permit Type   ACCESSORY DWELLING UNIT Site Address   462 SHELDON AVE
GRIDLEY, CA 95948
Applied   03/10/2022 Applicant   COOPRIDER JOHN & COOPERIDER LYNSEY
Approved   07/08/2022 Owner   COOPRIDER JOHN & COOPERIDER LYNSEY
Issued   07/08/2022 Contractor  
Parent Permit No.   Description   AS-BLT ADU(720) COVD(48) [BCE21-00197]
  Notes  
 
  Date of Inspection Inspection Type Inspector Result Remarks Notes

 11/18/20224-WAY ROUGH FRAMEDSINSPECTIONCANCELLED11/17/2022 5:21:03 AM Rpratt changed Inspection Date/Time from 11/17/2022 08:00 AM to 11/17/2022 12:00 PM 11/17/2022 8:12:05 AM Canceled with the Permit Center.

 11/18/20224-WAY ROUGH FRAMECHRISTOPHER ROBERTSPASS11/18/2022 2:44:37 PM 4-way rough frame - Approved

 02/10/2023GAS TESTRICHARD PRATTFAIL2/10/2023 9:02:24 AM 1. Post address on each building. 2. Post job site card on each building to be visible from the road. 3. Properly pressurize gas lines for test - gauge on zero. 4. Recall inspection when completed.

 02/13/2023GAS TESTRICHARD PRATTPASS2/13/2023 3:40:16 PM Natural gas conduit, trench and pressure test - Approved

 02/14/2023**PERMIT FINALRICHARD PRATTCANCELLED

 03/21/2023PGE GAS TAGCHRISTOPHER ROBERTSPASS3/21/2023 7:06:14 AM croberts changed Inspection Date/Time from 03/21/2023 08:00 AM to 03/21/2023 12:00 PM 3/21/2023 3:12:27 PM PGE gas test - Approved

 03/24/2023**PERMIT FINALRANDALL SMITHFAIL3/24/2023 3:49:02 PM 1. Provide final approval from Cal Fire 2. Provide final approval from Butte County Environmental Health 3. Provide final approval from Public Works. 4. Provide HERS testing report. 5. Provide vacuum breakers on the hose bibs. 6. Seal black pipe entering exterior siding next to main electrical panel. 7. Seal or foam raceways for the mini splits. 8. Provide a sediment trap at the water heater. 9. Insulate the water main. 10. Provide a humidistat in the bathroom for the exhaust fan. 11. Provide a vacancy sensor in the bathroom. 12. Provide chalking around the base of the water closet. 13. Provide a carbon monoxide detector. 14. Light switch in the attic must be in reach of the attic access. 15. Terminate PTR valve with in 6-24 inches of the ground. 16. Call for re inspection when corrections are completed. 3/24/2023 3:53:16 PM 1. Provide final approval from Cal Fire 2. Provide final approval from Butte County Environmental Health 3. Provide final approval from Public Works. 4. Provide HERS testing report. 5. Provide vacuum breakers on the hose bibs. 6. Seal black pipe entering exterior siding next to main electrical panel. 7. Seal or foam raceways for the mini splits. 8. Provide a sediment trap at the water heater. 9. Insulate the water main. 10. Provide a humidistat in the bathroom for the exhaust fan. 11. Provide a vacancy sensor in the bathroom. 12. Provide chalking around the base of the water closet. 13. Provide a carbon monoxide detector. 14. Light switch in the attic must be in reach of the attic access. 15. Terminate PTR valve with in 6-24 inches of the ground. 16. Call for re inspection when corrections are completed. 3/24/2023 3:54:47 PM 1. Provide final approval from Cal Fire 2. Provide final approval from Butte County Environmental Health 3. Provide final approval from Public Works. 4. Provide HERS testing report. 5. Provide vacuum breakers on the hose bibs. 6. Seal black pipe entering exterior siding next to main electrical panel. 7. Seal or foam raceways for the mini splits. 8. Provide a sediment trap at the water heater. 9. Insulate the water main. 10. Provide a humidistat in the bathroom for the exhaust fan. 11. Provide a vacancy sensor in the bathroom. 12. Provide chalking around the base of the water closet. 13. Provide a carbon monoxide detector. 14. Light switch in the attic must be in reach of the attic access. 15. Terminate PTR valve with in 6-24 inches of the ground. 16. Call for re inspection when corrections are completed.

 03/27/2023PW FINALPWROADSPASS

 03/28/2023CAL FIRE FINAL INSPETROY HANDPASS3/28/2023 9:39:07 AM Met all fire criteria

 03/30/2023**PERMIT FINALRANDALL SMITHFAIL3/30/2023 1:08:30 PM 1. Provide final approval from Environmental Health. Permit Center ok to final once EH signs off. 3/30/2023 3:07:04 PM 1. Provide final approval from Environmental Health. Permit Center ok to final once EH signs off. 3/30/2023 3:16:46 PM 1. Provide final approval from Environmental Health. Permit Center ok to final once EH signs off.

 04/07/2023ENV HEALTH RELEASEKATTY HERNANDEZPASSSEE NOTES4/4/2022 3:26:07 PM HOLD FOR SEPTIC, EHS21-0289, FINAL AND WATER LAB REPORT. 4/28/2022 4:55:18 PM SEPTIC PERMIT, EHS21-0289, RECEIVED FINAL APPROVAL. PENDING WATER LAB REPORT. 3/27/2023 3:05:57 PM RECEIVED COLIFORM BACTERIA REPORT WITH COLIFORM PRESENT. WILL NEED TO SUBMIT TWO CONSECUTIVE NEGATIVE RESULTS. WILL ALSO NEED TO SUBMIT NITRATE RESULTS. 4/7/2023 4:10:36 PM OKAY TO RELEASE. PENDING SECOND NEGATIVE COLIFORM BACTERIA REPORT AND NITRATE REPORT. OWNER WILL SUBMIT A COPY OF THE REPORTS ONCE AVAILABLE.