11/18/2022 | 4-WAY ROUGH FRAME | DSINSPECTION | CANCELLED | | 11/17/2022 5:21:03 AM
Rpratt changed Inspection Date/Time from 11/17/2022 08:00 AM to 11/17/2022 12:00 PM
11/17/2022 8:12:05 AM
Canceled with the Permit Center.
|
|
11/18/2022 | 4-WAY ROUGH FRAME | CHRISTOPHER ROBERTS | PASS | | 11/18/2022 2:44:37 PM
4-way rough frame - Approved
|
|
02/10/2023 | GAS TEST | RICHARD PRATT | FAIL | | 2/10/2023 9:02:24 AM
1. Post address on each building.
2. Post job site card on each building to be visible from the road.
3. Properly pressurize gas lines for test - gauge on zero.
4. Recall inspection when completed.
|
|
02/13/2023 | GAS TEST | RICHARD PRATT | PASS | | 2/13/2023 3:40:16 PM
Natural gas conduit, trench and pressure test - Approved
|
|
02/14/2023 | **PERMIT FINAL | RICHARD PRATT | CANCELLED | | |
|
03/21/2023 | PGE GAS TAG | CHRISTOPHER ROBERTS | PASS | | 3/21/2023 7:06:14 AM
croberts changed Inspection Date/Time from 03/21/2023 08:00 AM to 03/21/2023 12:00 PM
3/21/2023 3:12:27 PM
PGE gas test - Approved
|
|
03/24/2023 | **PERMIT FINAL | RANDALL SMITH | FAIL | | 3/24/2023 3:49:02 PM
1. Provide final approval from Cal Fire
2. Provide final approval from Butte County Environmental Health
3. Provide final approval from Public Works.
4. Provide HERS testing report.
5. Provide vacuum breakers on the hose bibs.
6. Seal black pipe entering exterior siding next to main electrical panel.
7. Seal or foam raceways for the mini splits.
8. Provide a sediment trap at the water heater.
9. Insulate the water main.
10. Provide a humidistat in the bathroom for the exhaust fan.
11. Provide a vacancy sensor in the bathroom.
12. Provide chalking around the base of the water closet.
13. Provide a carbon monoxide detector.
14. Light switch in the attic must be in reach of the attic access.
15. Terminate PTR valve with in 6-24 inches of the ground.
16. Call for re inspection when corrections are completed.
3/24/2023 3:53:16 PM
1. Provide final approval from Cal Fire
2. Provide final approval from Butte County Environmental Health
3. Provide final approval from Public Works.
4. Provide HERS testing report.
5. Provide vacuum breakers on the hose bibs.
6. Seal black pipe entering exterior siding next to main electrical panel.
7. Seal or foam raceways for the mini splits.
8. Provide a sediment trap at the water heater.
9. Insulate the water main.
10. Provide a humidistat in the bathroom for the exhaust fan.
11. Provide a vacancy sensor in the bathroom.
12. Provide chalking around the base of the water closet.
13. Provide a carbon monoxide detector.
14. Light switch in the attic must be in reach of the attic access.
15. Terminate PTR valve with in 6-24 inches of the ground.
16. Call for re inspection when corrections are completed.
3/24/2023 3:54:47 PM
1. Provide final approval from Cal Fire
2. Provide final approval from Butte County Environmental Health
3. Provide final approval from Public Works.
4. Provide HERS testing report.
5. Provide vacuum breakers on the hose bibs.
6. Seal black pipe entering exterior siding next to main electrical panel.
7. Seal or foam raceways for the mini splits.
8. Provide a sediment trap at the water heater.
9. Insulate the water main.
10. Provide a humidistat in the bathroom for the exhaust fan.
11. Provide a vacancy sensor in the bathroom.
12. Provide chalking around the base of the water closet.
13. Provide a carbon monoxide detector.
14. Light switch in the attic must be in reach of the attic access.
15. Terminate PTR valve with in 6-24 inches of the ground.
16. Call for re inspection when corrections are completed.
|
|
03/27/2023 | PW FINAL | PWROADS | PASS | | |
|
03/28/2023 | CAL FIRE FINAL INSPE | TROY HAND | PASS | | 3/28/2023 9:39:07 AM
Met all fire criteria
|
|
03/30/2023 | **PERMIT FINAL | RANDALL SMITH | FAIL | | 3/30/2023 1:08:30 PM
1. Provide final approval from Environmental Health.
Permit Center ok to final once EH signs off.
3/30/2023 3:07:04 PM
1. Provide final approval from Environmental Health.
Permit Center ok to final once EH signs off.
3/30/2023 3:16:46 PM
1. Provide final approval from Environmental Health.
Permit Center ok to final once EH signs off.
|
|
04/07/2023 | ENV HEALTH RELEASE | KATTY HERNANDEZ | PASS | SEE NOTES | 4/4/2022 3:26:07 PM
HOLD FOR SEPTIC, EHS21-0289, FINAL AND WATER LAB REPORT.
4/28/2022 4:55:18 PM
SEPTIC PERMIT, EHS21-0289, RECEIVED FINAL APPROVAL. PENDING WATER LAB REPORT.
3/27/2023 3:05:57 PM
RECEIVED COLIFORM BACTERIA REPORT WITH COLIFORM PRESENT. WILL NEED TO SUBMIT TWO CONSECUTIVE NEGATIVE RESULTS. WILL ALSO NEED TO SUBMIT NITRATE RESULTS.
4/7/2023 4:10:36 PM
OKAY TO RELEASE. PENDING SECOND NEGATIVE COLIFORM BACTERIA REPORT AND NITRATE REPORT. OWNER WILL SUBMIT A COPY OF THE REPORTS ONCE AVAILABLE.
|
|