Permit No. B21-2763 Permit Type   RESIDENTIAL Site Address   397 J ST
BIGGS, CA 95917
Applied   09/13/2021 Applicant   JASON MARR
Approved   10/07/2021 Owner   COMMUNITY HOUSING IMPROVEMENT PROGRAM INC
Issued   10/08/2021 Contractor   COMMUNITY HOUSING IMPROVEMENT PROGRAM INCORPORATED
Parent Permit No.   Description   NSF (1531) GAR (486) COVD (50) FROM MP21-0005
  Notes  
 
  Date of Inspection Inspection Type Inspector Result Remarks Notes

NPDESPWLANDDEVNOT REQUIRED

 11/05/2021UNDER SLAB PLUMBINGADAM KINGSLEYPASS11/5/2021 5:05:18 PM Setbacks also included

 11/05/2021FOUNDATION/FOOTINGSADAM KINGSLEYPASS11/5/2021 5:22:21 PM Eufer ground also included

 11/17/2021PRE-SLABADAM KINGSLEYPASS055817-02 - Scheduled by IVR.11/17/2021 2:59:59 PM Dwelling & garage

 02/03/2022TAG ELECTRICADAM KINGSLEYPASS2/3/2022 3:37:05 PM Construction power approved. 200A -SFD

 03/22/2022TRUSS ROOFRANDALL SMITHPASS

 03/22/2022SHEARWALL/B.W.P.-INTRANDALL SMITHPASS

 03/22/2022SHEARWALL/B.W.P.-EXTRANDALL SMITHFAIL3/22/2022 1:17:12 PM Detail 1/ S6-1 missing A35 clips at top and bottom of window header and sill. Install per plans or equal. Ok to proceed.

 03/22/2022ROOF NAILRANDALL SMITHPASS3/22/2022 1:17:17 PM 1. Remove shiners in roof sheathing. Ok to proceed. Shiner removal to be checked at 4 way inspection

 05/12/20224-WAY ROUGH FRAMESCOTT YOUNGFAIL059349-01 - Scheduled by IVR.5/13/2022 6:10:35 AM Romex running through truss webs laying on or right up against gang nails. Separate and secure. If using staples make sure lay romex flat,not on its side. Came back 1 1/2 hours later to check as asked by contractor, still missed a lot . Complete and call back for reinspection.

 05/18/20224-WAY ROUGH FRAMERANDALL SMITHPASS059520-01 - Scheduled by IVR.5/18/2022 4:54:03 PM Verified corrections from previous 4 way inspection.

 08/24/2022GAS TESTCHRISTOPHER ROBERTSPASS061707-02 - Scheduled by IVR.8/24/2022 6:48:15 AM croberts changed Inspection Date/Time from 08/24/2022 08:00 AM to 08/24/2022 11:30 AM 8/24/2022 11:38:30 AM Gas test - approved

 09/15/2022PGE GAS TAGRICHARD PRATTPASSNEEDS TAG9/15/2022 5:06:13 AM rpratt changed Inspection Date/Time from 09/15/2022 08:00 AM to 09/15/2022 08:30 AM 9/15/2022 6:03:11 AM rpratt changed Inspection Date/Time from 09/15/2022 08:30 AM to 09/15/2022 09:30 AM 9/15/2022 9:44:51 AM PG&E Gas Meter Release - Approved

 11/02/2022**PERMIT FINALRICHARD PRATTFAIL063173-01 - Scheduled by IVR.11/2/2022 1:46:53 PM 1. Complete HERS Documentation with Cheers or CalCerts. 2. Obtain Cal Fire Final Approval. 3. Obtain City of Biggs Final Approval. 4. Complete Solar installation and Final. 5. Extend clean out to be flush with finish surface and seal to prevent insect and rodent intrusion. Garage and Kitchen sink 6. Remove insulation from the FAU pan in the attic. 7. Provide GFCI Protection for the kitchen receptacles- check all 8. Wrap all exterior water piping to protect from freezing. 9. Repair wiring to the Fire Sprinkler bell, did not ring after a minute. 10. Install missing Drier Breaker or a cover in the MSP. 11. Recall inspection when completed.

 11/10/2022CAL FIRE FINAL INSPETROY HANDPASS11/10/2022 3:45:01 PM Needs to cover opening or install circuit breaker in dryer slot. all other fire criteria met 11/16/2022 2:12:18 PM Applicant has placed a circuit breaker in the opening.

 11/30/2022**PERMIT FINALCHRISTOPHER ROBERTSPARTIAL11/30/2022 6:31:08 AM croberts changed Inspection Date/Time from 11/30/2022 08:00 AM to 11/30/2022 1:30 PM 11/30/2022 3:23:11 PM Most of corrections have been completed. * waiting for solar final * City of Biggs will sign off on final when solar is finaled.

CITY OF BIGGS FINALCITY OF BIGGSPASS