| ENV HEALTH RELEASE | ALANA KONG | PASS | New septic system installed | 9/10/2021 9:01:37 AM
Approved 9/10/21 - Septic system installed, final approved by Katty. Ensure tank and leach field meet 5 ft. minimum setback from load-bearing structures.
|
|
04/25/2022 | SETBACKS | RICHARD PRATT | PASS | | 4/25/2022 6:23:43 AM
rpratt changed Inspection Date/Time from 04/25/2022 08:30 AM to 04/25/2022 2:00 PM
4/25/2022 6:30:22 AM
rpratt changed Inspection Date/Time from 04/25/2022 02:00 PM to 04/25/2022 10:00 AM
4/25/2022 12:42:07 PM
Setbacks checked and Approved
|
|
04/25/2022 | PIER/COLUMN FOOTINGS | RICHARD PRATT | PASS | | 4/25/2022 6:23:46 AM
rpratt changed Inspection Date/Time from 04/25/2022 08:30 AM to 04/25/2022 2:00 PM
4/25/2022 6:30:25 AM
rpratt changed Inspection Date/Time from 04/25/2022 02:00 PM to 04/25/2022 10:00 AM
4/25/2022 12:42:10 PM
Pier footings locations and depth per plan- Approved -
|
|
04/25/2022 | FOUNDATION/FOOTINGS | RICHARD PRATT | FAIL | | 4/25/2022 6:23:50 AM
rpratt changed Inspection Date/Time from 04/25/2022 08:30 AM to 04/25/2022 2:00 PM
4/25/2022 6:30:28 AM
rpratt changed Inspection Date/Time from 04/25/2022 02:00 PM to 04/25/2022 10:00 AM
4/25/2022 12:42:14 PM
Provide a 3rd #4 rebar to all pier footings.
Verify proper number of anchor bolts are installed at all shear walls.
Add rebar at garage grade beam.
Recall inspection when completed.
|
|
04/25/2022 | UFER GROUND | RICHARD PRATT | PASS | | 4/25/2022 6:23:39 AM
rpratt changed Inspection Date/Time from 04/25/2022 08:30 AM to 04/25/2022 2:00 PM
4/25/2022 6:30:18 AM
rpratt changed Inspection Date/Time from 04/25/2022 02:00 PM to 04/25/2022 10:00 AM
4/25/2022 12:42:03 PM
Eufer ground - Approved
|
|
04/26/2022 | FOUNDATION/FOOTINGS | SCOTT YOUNG | PASS | | |
|
05/18/2022 | UNDERFLOOR PLUMBING | RICHARD PRATT | PASS | AM REQUEST | 5/18/2022 3:04:24 PM
Underfloor plumbing - on test and Approved
|
|
05/25/2022 | UNDERFLOOR FRAMING | SCOTT YOUNG | FAIL W/RE-INSP FEE | | 5/25/2022 12:51:16 PM
Hey My name is Manuel Ortega I would like to reschedule my inspection for
Underfloor framing on B21-2292
Address: 13908 W Park Dr, Magalia, CA 95954
--
Adrian M. Ortega
AGO Graphics
Sacramento California
5/26/2022 6:21:25 AM
Showed up at 10:30 waited 15 min,
No plans onsite. Left a card with time and date.
5/26/2022 6:23:56 AM
Showed up at 10:30 waited 15 min,
No plans onsite. Left a card with time and date.
|
|
05/31/2022 | UNDERFLOOR FRAMING | RANDALL SMITH | FAIL | 916-801-1071 | 5/31/2022 12:52:22 PM
1. Provide missing anchor bolts through out. Provide pull test as there are more than 5 missing anchor bolts.
2. Pull all shiners in rim joist and nail as per plans.
3. Complete nailing in post to beam connections.
4. Provide all thread connection to hdu5 at front door.
5.Call for reinspection when completed.
|
|
06/03/2022 | FOUNDATION/FOOTINGS | RICHARD PRATT | PASS | | 6/3/2022 6:27:17 AM
rpratt changed Inspection Date/Time from 06/03/2022 08:00 AM to 06/03/2022 4:00 PM
6/3/2022 3:38:06 PM
Pre pour slab - Approved
|
|
06/03/2022 | UNDERFLOOR FRAMING | RICHARD PRATT | PASS | | 6/3/2022 3:38:11 PM
Underfloor framing - all previous correction items completed
|
|
08/23/2022 | TRUSS ROOF | RICHARD PRATT | VOID | | 8/23/2022 5:19:49 PM
duplicate
|
|
08/24/2022 | SHEARWALL/B.W.P.-EXT | RANDALL SMITH | FAIL | | 8/24/2022 2:50:18 PM
1. Tighten HDU's at the garage left side.
2. Provide missing edge nailing 4 inches of at garage both sides.
3. Provide A35 clips as per plan sheet S4 and SN 1 shearwall schedule.
4. Provide cst-16 strapping as per detail SD1-D1.
agographics@gmail.com
|
|
08/24/2022 | ROOF FRAME/SHEATHING | RANDALL SMITH | FAIL | | 8/24/2022 2:50:24 PM
1. Provide an approved set of truss calcs on site.
2. Call for reinspection when corrections are completed.
Fire rated plywood was NOT used on roof sheathing.
|
|
08/31/2022 | TRUSS ROOF | RANDALL SMITH | PASS | | |
|
08/31/2022 | SHEARWALL/B.W.P.-EXT | RANDALL SMITH | PASS | | 8/31/2022 4:21:53 PM
All previous corrections have been completed
|
|
08/31/2022 | ROOF NAIL | RANDALL SMITH | PASS | | 8/31/2022 4:21:58 PM
Passed
|
|
10/06/2022 | 4-WAY ROUGH FRAME | SCOTT YOUNG | FAIL | | 10/10/2022 6:02:54 AM
Four way rough was not completed.
1. DWV pipes were dry.
2. Pull all romex away from gang nails and secure.
3. Seal under tub with wire mesh or similar to rodent proof .
4. Seal all cut outs in floor to sub area.
|
|
10/13/2022 | 4-WAY ROUGH FRAME | SCOTT YOUNG | PASS | | 10/19/2022 5:51:27 AM
Approved.
|
|
11/10/2022 | SHEARWALL/B.W.P.-INT | RICHARD PRATT | PASS | | 11/10/2022 11:16:15 AM
Interior shear wall installation - Approved
|
|
02/28/1850 | PW FINAL | PWROADS | | VOIDED (JYM 11/15/2022) | 11/15/2022 1:21:00 PM
Inspection voided by JYM.
|
|
02/01/2023 | PGE ELECTRIC TAG | WOODY TOWNSEND | PASS | | 2/1/2023 4:39:06 PM
One gfci circuit connected.
|
|
09/11/2023 | UNDERGROUND GAS | RANDALL SMITH | PASS | | 9/11/2023 3:09:39 PM
Ok to cover. Provide a yellow tracer wire 6 inches above the gas pipe.
|
|
10/09/2023 | CAL FIRE FINAL INSPE | TROY HAND | PASS | | 10/5/2023 2:23:54 PM
1. No address on the building.
2. Need 10-foot clearance around the propane tank.
10/9/2023 3:10:28 PM
Both corrections have been made. Ok to final.
|
|
10/11/2023 | **PERMIT FINAL | RICHARD PRATT | CANCELLED | | 10/11/2023 6:05:34 AM
rpratt changed Inspection Date/Time from 10/11/2023 08:00 AM to 10/11/2023 12:30 PM
10/11/2023 7:38:27 AM
Fire Sprinkler Permit is expired. Email sent:
Good morning,
I regret to inform you that the Final inspection that you have requested has been cancelled, due to the Fire Sprinkler Permit having expired. Please contact your fire sprinkler contractor and have them re-new their permit. Only after it has be re-instated, will you be allowed to schedule your building final.
Thank you,
Rich Pratt
|
|
10/25/2023 | **PERMIT FINAL | LARRY AKERS | FAIL | REQUESTS AM | 10/25/2023 10:19:48 AM
1) all receptacles in garage must be gfci protected
2) kitchen must be gfci and arch fault protected
3) hall bath needs gfci
4) garage receptacle's no gfci protection
5) furnace primary and secondary needs a 90 degree fitting installed
6) both bath fans need to be on a humidistat
7) breaker 5, 11, much be arch fault protected
8) breaker 13 must be gfci protected.
9) call in fire sprinkler permit
10) need hand rail at front entrance.
|
|
11/01/2023 | **PERMIT FINAL | RICHARD PRATT | PASS | | 11/1/2023 4:44:56 AM
rpratt changed Inspection Date/Time from 11/01/2023 08:00 AM to 11/01/2023 08:30 AM
11/1/2023 12:58:58 PM
Building Final- Approved
|
|