08/06/2021 | PW FINAL | PWROADS | PASS | | |
|
02/03/2022 | 4-WAY ROUGH FRAME | SCOTT YOUNG | FAIL | 057302-01 MSG! -Msg! Scheduled by IVR. | 2/4/2022 6:34:06 AM
DWV not under test.
Simpson hangers required at bedroom closet.
Complete nailing on all headers.
2/4/2022 6:38:25 AM
DWV not under test.
Simpson hangers required at bedroom closet.
Complete nailing on all headers.
|
|
02/08/2022 | 4-WAY ROUGH FRAME | ADAM KINGSLEY | PARTIAL | 057371-01 MSG! -Msg! Scheduled by IVR. | 2/8/2022 10:31:22 AM
Previous corrections are completed. Remodel portions only-approved.
Addition phase has not been started at present.
|
|
03/21/2022 | SHOWER PAN/TUB TEST | ADAM KINGSLEY | PARTIAL | 058149-01 MSG! -Msg! Scheduled by IVR. | 3/21/2022 12:54:44 PM
Remodel portions only-approved
|
|
03/28/2022 | **PERMIT FINAL | WOODY TOWNSEND | PARTIAL | 058313-01 MSG! -Msg! Scheduled by IVR. | 3/28/2022 8:55:34 PM
Remodeled area safe to occupy. Complete project final will be required after addition is completed.
|
|
04/14/2022 | FOUNDATION/FOOTINGS | RANDALL SMITH | PASS | 058809-01 MSG! -Msg! Scheduled by IVR. | 4/14/2022 3:31:47 PM
Setback verified. All hold downs installed.
|
|
04/20/2022 | UNDERFLOOR PLUMBING | EFRAIN RUVALCABA | CANCELLED | Cancelled on 4/20/2022 at 9:33 AM | |
|
04/25/2022 | UNDERFLOOR PLUMBING | SCOTT YOUNG | PASS | 058970-02 MSG! -Msg! Scheduled by IVR. | 4/26/2022 6:10:57 AM
DWV was not holding under test.
Pier footings we're not to size according to the plans.
Came back at end of day ,underfloor plumbing passed, column footings not ready.
|
|
05/05/2022 | PIER/COLUMN FOOTINGS | RANDALL SMITH | PASS | 059251-01 - Scheduled by IVR. | 5/5/2022 4:11:37 PM
Passed
|
|
05/18/2022 | ROOF NAIL | RANDALL SMITH | CANCELLED | 059564-01 MSG! -Msg! Scheduled by IVR. | 5/18/2022 4:53:52 PM
Requested shear and roof/truss inspection. Not ready. Advised remove all shiners. Install missing hold down and install H1 clips to trusses and call for reinspection.
|
|
05/19/2022 | ROOF NAIL | RANDALL SMITH | PASS | 059650-01 - Scheduled by IVR. | 5/19/2022 2:13:43 PM
Roof nail and trusses inspected. Strapping installed as per plans
5/19/2022 2:38:30 PM
Roof nail and trusses inspected. Strapping installed as per plans
5/19/2022 3:37:21 PM
Roof nail and trusses inspected. Strapping installed as per plans
5/19/2022 3:44:22 PM
Roof nail and trusses inspected. Strapping installed as per plans
|
|
05/19/2022 | SHEARWALL/B.W.P.-EXT | RANDALL SMITH | PASS | | 5/19/2022 3:45:50 PM
Passed checked nailing and hold downs.
|
|
06/09/2022 | 4-WAY ROUGH FRAME | ADAM KINGSLEY | FAIL | 060078-02 - Scheduled by IVR. | 6/9/2022 4:24:15 PM
1. Provide listed CSST strike plates at CSST gas pipe/framing penetrations.
2. Install skylights or equal.
3. Provide drywall backing or equal at vaulted ceiling/interior wall connection.
Ok to insulate after skylights installed. Recall 4way inspection after corrections addressed.
|
|
06/13/2022 | 4-WAY ROUGH FRAME | RANDALL SMITH | PASS | 060187-01 MSG! -Msg! Scheduled by IVR. | 6/13/2022 3:26:08 PM
All corrections from previous list were completed
|
|
06/13/2022 | STUCCO (LATH) | RANDALL SMITH | PASS | | 6/13/2022 3:27:44 PM
Passed
|
|
06/06/2022 | 4-WAY ROUGH FRAME | RANDALL SMITH | CANCELLED | Cancelled on 6/6/2022 at 7:26 PM | |
|
06/27/2022 | GAS TEST | SCOTT YOUNG | FAIL | 060535-01 MSG! -Msg! Scheduled by IVR. | 6/28/2022 6:02:36 AM
Place blue tracer wire on water line , remove all rocks from floor of trench and sand and shade place caution tape approx 4-6" below grade
|
|
06/28/2022 | GAS TEST | ADAM KINGSLEY | PASS | 060605-01 MSG! -Msg! Scheduled by IVR. | 6/28/2022 11:21:52 AM
Whole system test_ approved
|
|
06/28/2022 | SITE UTILITIES | ADAM KINGSLEY | PASS | | 6/28/2022 11:21:59 AM
Underground gas, water supply & building drain pipes - approved
|
|
06/30/2022 | ROUGH ELECTRICAL | RANDALL SMITH | NOT REQUIRED | 060648-01 - Scheduled by IVR. | 6/30/2022 3:16:53 PM
Rough electrical completed at 4 way inspection
|
|
07/27/2022 | SHOWER PAN/TUB TEST | SCOTT YOUNG | PASS | 061192-01 MSG! -Msg! Scheduled by IVR. | 7/27/2022 2:14:50 PM
Schluter membrane.
7/27/2022 2:15:35 PM
Schluter membrane.
7/27/2022 2:16:45 PM
Schluter membrane.
7/27/2022 2:18:27 PM
Schluter membrane.
|
|
08/09/2022 | ROUGH FRAME | RICHARD PRATT | PASS | 061485-01 MSG! -Msg! Scheduled by IVR. | 8/9/2022 5:42:28 AM
Rpratt changed Inspection Date/Time from 08/09/2022 08:30 AM to 08/09/2022 1:00 PM
8/9/2022 12:04:50 PM
Under Deck framing - Approved
8/9/2022 12:20:08 PM
Under Deck framing - Approved
|
|
08/29/2022 | **PERMIT FINAL | WOODY TOWNSEND | FAIL | 061798-01 - Scheduled by IVR. | 8/29/2022 2:59:01 PM
1. Entry ramp is over 8.33%. Provide stairs and rails off entry landing.
2. Provide HERs final through Cheers registry.
1/9/2023 4:51:27 PM
Called 990-2632 to clarify handrails picture sent through email, was told wrong number.
|
|
02/08/2023 | **PERMIT FINAL | SCOTT YOUNG | PASS | | 2/8/2023 5:16:02 PM
Approved
Corrections have been completed
|
|