Permit No. B21-0877 Permit Type   RESIDENTIAL Site Address   1146 BUTTE AVE
OROVILLE, CA 95965
Applied   04/01/2021 Applicant   MATT PRESTON
Approved   08/13/2021 Owner   STEVE POWERS
Issued   08/13/2021 Contractor   MATT PRESTON
Parent Permit No.   Description   NSF (1837) GAR (528) COVD (180)
  Notes  
 
  Date of Inspection Inspection Type Inspector Result Remarks Notes

 09/05/2021FOUNDATION/FOOTINGSADAM KINGSLEYCANCELLEDCancelled on 9/5/2021 at 2:18 PM

 09/08/2021FOUNDATION/FOOTINGSADAM KINGSLEYPASS054328-01 - Scheduled by IVR.

 10/05/2021UNDERFLOOR FRAMINGRICHARD PRATTPASS054934-01 - Scheduled by IVR.10/5/2021 6:24:22 AM rpratt changed Inspection Date/Time from 10/05/2021 08:00 AM to 10/05/2021 3:30 PM 10/5/2021 5:05:18 PM Underfloor framing - Approved

 10/18/2021PRE-SLABADAM KINGSLEYPASS055264-02 - Scheduled by IVR.10/18/2021 3:04:01 PM Garage slab-approved

 10/15/2021PRE-SLABSCOTT YOUNGCANCELLEDCancelled on 10/15/2021 at 7:46 AM

 01/21/2022ROOF NAILCURTIS L. JOHNSONPASS1/24/2022 12:14:46 PM Roof Nailing approved only. Informed the owner that a plan change would be needed deleting the closet in the garage and adding the space as an extension of the master bath prior to the 4-way inspection.

 03/21/2022PGE ELECTRIC TAGADAM KINGSLEYPASSAM REQUEST3/21/2022 12:54:36 PM 200 amp service approved for construction power

 03/21/2022SHEARWALL/B.W.P.-EXTADAM KINGSLEYFAIL3/21/2022 12:54:40 PM 1. At bedroom 2 & 3 hold downs required on 3ft brace wall panels . Brace wall panels less than 4ft are required to be alternates in our SZ D 2. Provide H-1 clips on truss/ plate connection per plans. 3. Provide an additional stud at over notched stud by electric panel. 4. Provide retrofit anchors and washers at plate splice within 12 in 5. Outstanding roof nail corrections. Provide plans for updated master bath room expansion. Ok to proceed and follow up at 4 way inspection

 05/16/2022SHEARWALL/B.W.P.-EXTSCOTT YOUNGPASS059516-01 - Scheduled by IVR.5/16/2022 10:30:25 AM Corrections have been completed 5/17/2022 6:00:33 AM Corrections have been completed

 05/16/20224-WAY ROUGH FRAMESCOTT YOUNGFAIL059514-01 - Scheduled by IVR.5/17/2022 6:00:37 AM 1. Interior brace wall panel in hall bath, will be sheeted on both side, tub was already set before Sheetrock was put and thus not being able to complete full shear. 2. Revisions have not been approved by the county for master bath change. 3. Possible revisions required at door entry interior shear,

 05/31/20224-WAY ROUGH FRAMESCOTT YOUNGPASS059867-01 MSG! -Msg! Scheduled by IVR.6/1/2022 5:57:42 AM Revisions have been done .

 06/08/2022SHEARWALL/B.W.P.-INTSCOTT YOUNGPASS060106-01 MSG! -Msg! Scheduled by IVR.6/8/2022 8:41:35 PM This inspection was for approx. 8' of interior shear to right of door as you enter .

 06/16/2022SHEARWALL/B.W.P.-EXTRANDALL SMITHPASS6/13/2022 2:56:27 PM AM PLEASE INT. AND EX. BRACEWALL 6/16/2022 3:41:54 PM Passed 6/16/2022 3:42:29 PM Passed 6/16/2022 3:44:04 PM Passed

 07/29/2022SHOWER PAN/TUB TESTCHRISTOPHER ROBERTSPASS061241-01 - Scheduled by IVR.7/29/2022 7:11:38 AM croberts changed Inspection Date/Time from 07/29/2022 08:00 AM to 07/29/2022 1:30 PM 7/29/2022 2:22:27 PM Shower pan/tub test - approved

 12/23/2022GAS PIPINGCHRISTOPHER ROBERTSPASS064327-01 - Scheduled by IVR.12/23/2022 6:05:00 AM croberts changed Inspection Date/Time from 12/23/2022 08:00 AM to 12/23/2022 12:00 PM 12/23/2022 1:55:27 PM Gas piping - Approved

 12/29/2022ENV HEALTH RELEASENOT REQUIRED12/29/2022 11:17:09 AM Served By TWSD for sewer and water supply.

 01/09/2023CAL FIRE FINAL INSPETROY HANDPASS1/9/2023 4:02:27 PM Met all fire criteria.

 01/10/2023**PERMIT FINALSCOTT YOUNGFAIL064524-01 - Scheduled by IVR.1/9/2023 4:56:19 PM To meet the requirements of page 2 of your CF1R-PRF-01E, you must obtain the required 3.59kw of Solar. You have a ground mount PV Permit B22-0381, under plan review that Does Not meet those requirements as it is only 3.24kw. 1/10/2023 5:13:37 PM 1. Anti syphon / back flow devices. 2. Front landing required, min. 36"x36" 3. Gas has not been connected to house, tank not set. 4. Insulate water line into water heater.in garage. 5. GFCI required at washing machine and within 6' of sink. 6. Release line for fire sprinkler required to be directed towards the ground. 7. Grading not completed. 8. Front walk and garage entry not finished. 9. Back sliding door is approx 8' above grade. Back deck not completed. 1/11/2023 5:55:55 AM 1. Anti syphon / back flow devices. 2. Front landing required, min. 36"x36" 3. Gas has not been connected to house, tank not set. 4. Insulate water line into water heater.in garage. 5. GFCI required at washing machine and within 6' of sink. 6. Release line for fire sprinkler required to be directed towards the ground. 7. Grading not completed. 8. Front walk and garage entry not finished. 9. Back sliding door is approx 8' above grade. Back deck not completed.

 01/11/2023**PERMIT FINALSCOTT YOUNGFAIL1/12/2023 5:44:16 AM Previous corrections not completed. To meet the requirements of page 2 of your CFR-PRF-O1E, you must obtain the required 3.59 KW of solar. You have a ground mount permit , B22-0381, under plan review that does not meet those requirements as it is only 3.24 kw. This will need to be resolved prior to final of permit B21-0877. 1/12/2023 5:44:37 AM Previous corrections not completed. To meet the requirements of page 2 of your CFR-PRF-O1E, you must obtain the required 3.59 KW of solar. You have a ground mount permit , B22-0381, under plan review that does not meet those requirements as it is only 3.24 kw. This will need to be resolved prior to final of permit B21-0877. 1/19/2023 9:54:52 AM ENERGY COMPLIANCE FORM ATTACHED, REVISED TO SHOW 3.18KW REQUIRED.

 07/18/2023PW FINALPWCONSTRUCTIONPASS7/18/2023 8:24:59 AM PASS PER R4

 08/07/2023**PERMIT FINALRANDALL SMITHPASS068151-01 MSG! -Msg! Scheduled by IVR.8/7/2023 2:51:24 PM Permit B22-3081 solar was finaled 8-3-2023. All previous corrections were completed 8/7/2023 3:19:00 PM See notes below