03/29/2021 | PW FINAL | PWROADS | PASS | | |
|
05/26/2021 | FOUNDATION/FOOTINGS | SCOTT YOUNG | PASS | 052403-01 - Scheduled by IVR. | 5/26/2021 1:20:31 PM
Verified and approved:
Setbacks
Footing and foundation
Eupher ground
Pier and columns
|
|
06/11/2021 | UNDERFLOOR FRAMING | SCOTT YOUNG | PASS | 052704-01 - Scheduled by IVR. | |
|
10/11/2021 | ROOF NAIL | SCOTT YOUNG | PASS | 055098-03 MSG! -Msg! Scheduled by IVR. | |
|
10/11/2021 | SHEARWALL/B.W.P.-EXT | SCOTT YOUNG | PASS | 055098-02 - Scheduled by IVR. | |
|
10/11/2021 | SHEAR TRANSFER | SCOTT YOUNG | PASS | 055098-01 - Scheduled by IVR. | |
|
10/13/2021 | TAG ELECTRIC | SCOTT YOUNG | FAIL | | 10/13/2021 11:39:52 AM
Open spaces in main panel, place breaker or blank cover.
Call for reinspection when ready.
|
|
10/22/2021 | TAG ELECTRIC | RICHARD PRATT | FAIL | | 10/22/2021 6:28:11 AM
rpratt changed Inspection Date/Time from 10/22/2021 08:00 AM to 10/22/2021 09:30 AM
10/22/2021 12:40:00 PM
Move MSP out of the framing to allow the door to fully open, now and at final.
Label breakers in the MSP.
Recall inspection when completed.
|
|
10/27/2021 | TAG ELECTRIC | ADAM KINGSLEY | PASS | | 10/27/2021 2:16:03 PM
Construction power approved
Previous corrections are completed
|
|
01/14/2022 | UNDERGROUND WATER PI | ADAM KINGSLEY | PASS | | 1/14/2022 4:15:00 PM
Water supply, Meter to SFD-approved
|
|
| ENV HEALTH RELEASE | ALANA KONG | PASS | | 5/20/2021 4:30:57 PM
HOLD FOR SEPTIC, EHS21-0184, FINAL.
1/27/2022 12:51:20 PM
FINAL OF EHS21-0184 COMPLETED
|
|
02/03/2022 | 4-WAY ROUGH FRAME | RICHARD PRATT | FAIL | 057299-01 MSG! -Msg! Scheduled by IVR. | 2/3/2022 6:11:03 AM
rpratt changed Inspection Date/Time from 02/03/2022 to 02/03/2022
2/3/2022 1:42:47 PM
Ground all metal boxes - check all, throughout.
Complete laundry exhaust duct and terminate to the exterior.
Repair bath exhaust duct without smashing at the transition from 3" fan box to 4" duct
Provide nail plate protection for NM Cable as marked and required- check throughout.
Provide nail plate protection for DWV in master bath - both side of wall.
Provide 2 missing receptacles at kitchen counter per plan.
Provide the Stamped Approved Fire Sprinkler plans on-site for the inspection.
Recall inspection when completed.
|
|
02/07/2022 | 4-WAY ROUGH FRAME | RICHARD PRATT | PASS | | 2/7/2022 6:21:13 AM
rpratt changed Inspection Date/Time from 02/07/2022 08:00 AM to 02/07/2022 2:00 PM
2/7/2022 4:37:13 PM
4 way corrections completed
|
|
| ELECTRICAL FINAL | RICHARD PRATT | | VOIDED (RDP 4/11/2022) | 4/11/2022 6:19:44 AM
Inspection voided by RDP. Most recent remarks follow: 058729-02 - Scheduled by IVR.
|
|
| PLUMBING FINAL | RICHARD PRATT | | VOIDED (RDP 4/11/2022) | 4/11/2022 6:22:30 AM
Inspection voided by RDP. Most recent remarks follow: 058729-04 - Scheduled by IVR.
|
|
| MECHANICAL FINAL | RICHARD PRATT | | VOIDED (RDP 4/11/2022) | 4/11/2022 6:22:47 AM
Inspection voided by RDP. Most recent remarks follow: 058729-03 MSG! -Msg! Scheduled by IVR.
|
|
| FIRE SPRINKLERS | RICHARD PRATT | | VOIDED (RDP 4/11/2022) | 4/11/2022 6:25:47 AM
Inspection voided by RDP. Most recent remarks follow: 058729-01 - Scheduled by IVR.
|
|
04/11/2022 | **PERMIT FINAL | RICHARD PRATT | FAIL | 058727-01 - Scheduled by IVR. | 4/11/2022 3:54:21 PM
1. Provide a pressure relief valve for the water heater and drain to the exterior.
2. Provide a bollard for vehicle protection for the water heater.
3. Provide tamper resistant caps at the condenser.
4. Provide an air gap for the dishwasher.
5. Provide GFCI protection for laundry room receptacles.
6. Provide a humidistat for the shower exhaust fans.
7. Recall inspection when completed.
4/11/2022 4:32:09 PM
1. Provide a pressure relief valve for the water heater and drain to the exterior.
2. Provide a bollard for vehicle protection for the water heater.
3. Provide tamper resistant caps at the condenser.
4. Provide an air gap for the dishwasher.
5. Provide GFCI protection for laundry room receptacles.
6. Provide a humidistat for the shower exhaust fans.
7. Recall inspection when completed.
|
|
04/18/2022 | **PERMIT FINAL | RANDALL SMITH | PARTIAL | | 4/19/2022 6:40:51 AM
Passed all previous corrections written on previous final inspection. Partial as pending approval from Cal Fire.
|
|
04/19/2022 | CAL FIRE FINAL INSPE | CHRIS BOYD | PASS | | |
|
04/19/2022 | **PERMIT FINAL | ADAM KINGSLEY | PASS | | 4/19/2022 5:16:33 PM
VERIFIED CALFIRE FINAL CLEARANCE WAS PROVIDED.
|
|