Permit No. B20-3674 Permit Type   RESIDENTIAL Site Address   1384 HONEY RUN RD
CHICO, CA 95928
Applied   12/31/2020 Applicant   GARRETT ROTHGERY
Approved   05/11/2021 Owner   GARRETT ROTHGERY
Issued   05/12/2021 Contractor   TRILOGY CONSTRUCTION INC
Parent Permit No.   Description   REPL SFD (2227) GAR (937) COVD (687) CAMP FIRE
  Notes  
 
  Date of Inspection Inspection Type Inspector Result Remarks Notes

PW FINALPWCONSTRUCTION

FOUNDATION/FOOTINGSDSINSPECTIONA.M. Inspection7/28/2021 1:23:51 PM 7/28/2021 1:23 PM TRILOGY CONSTRUCTION INC Call Shawn 530-966-5106 Contact Name: TRILOGY CONSTRUCTION INC Site Address: 1384 HONEY RUN RD Phone: 5308771180 e-Mail: info@calltrilogy.com

 07/29/2021FOUNDATION/FOOTINGSSCOTT YOUNGPASSPM inspection. Approved plans in tube.7/28/2021 1:58:18 PM 7/28/2021 1:58 PM TRILOGY CONSTRUCTION INC Contact Shawn 966-5106 Contact Name: TRILOGY CONSTRUCTION INC Site Address: 1384 HONEY RUN RD Phone: 5308771180 e-Mail: info@calltrilogy.com 7/29/2021 11:31:08 AM Also passed: Eupher ground Pier and column Setbacks 7/30/2021 8:36:39 AM Also passed: Eupher ground Pier and column Setbacks

 08/04/2021UNSPECIFIEDSCOTT YOUNGCANCELLEDP.M. Inspection8/3/2021 1:09:03 PM 8/3/2021 1:09 PM TRILOGY CONSTRUCTION INC Garage slab inspection - Shawn 966-5106 Contact Name: TRILOGY CONSTRUCTION INC Site Address: 1384 HONEY RUN RD Phone: 5308771180 e-Mail: info@calltrilogy.com 8/4/2021 1:06:04 PM Spoke with Shawn with trilogy, explained that we need to collect the under construction elevation cert. prior to next inspection. 8/4/2021 1:11:36 PM Spoke with Shawn with trilogy, explained that we need to collect the under construction elevation cert. prior to next inspection. 8/4/2021 2:13:47 PM NO ELEV CERT NEEDED/DELETED THE INSPECTIONS. HOUSE IS OUTSIDE THE FLOOD ZONE SEE EFRAIN NOTE IN REVIEWS 8/5/2021 6:07:16 AM Spoke with Shawn with trilogy, explained that we need to collect the under construction elevation cert. prior to next inspection.

 08/05/2021PRE-SLABSCOTT YOUNGPASS8/5/2021 1:32:13 PM They are pouring a small slab for the pump house, it was formed up but not ready for inspection. They e Will be sending pics prior to pour.

 09/09/2021UNDERFLOOR PLUMBINGLARRY AKERSFAILA.M. please9/8/2021 8:42:49 AM 9/8/2021 8:42 AM TRILOGY CONSTRUCTION INC Contact Shawn 966-5106 Contact Name: TRILOGY CONSTRUCTION INC Site Address: 1384 HONEY RUN RD Phone: 5308771180 e-Mail: info@calltrilogy.com 9/9/2021 9:24:03 AM Has 2 plumbing leaks. Correct and recall, ok to install floor plywood less where leaks are.

 09/09/2021UNDERFLOOR FRAMINGLARRY AKERSPASSA.M. please9/8/2021 8:42:48 AM 9/8/2021 8:42 AM TRILOGY CONSTRUCTION INC Contact Shawn 966-5106 Contact Name: TRILOGY CONSTRUCTION INC Site Address: 1384 HONEY RUN RD Phone: 5308771180 e-Mail: info@calltrilogy.com

 09/10/2021UNDERFLOOR PLUMBINGRICHARD PRATTPASSContact Shawn 966-51069/9/2021 12:40:09 PM 9/9/2021 12:40 PM TRILOGY CONSTRUCTION INC Contact Name: TRILOGY CONSTRUCTION INC Site Address: 1384 HONEY RUN RD Phone: 5308771180 e-Mail: info@calltrilogy.com 9/10/2021 6:57:49 AM rpratt changed Inspection Date/Time from 09/10/2021 08:00 AM to 09/10/2021 12:00 PM 9/10/2021 2:54:14 PM Underfloor plumbing - approved

 11/05/2021SHEARWALL/B.W.P.-INTRICHARD PRATTCANCELLED11/5/2021 7:06:56 AM rpratt changed Inspection Date/Time from 11/05/2021 08:00 AM to 11/05/2021 09:00 AM 11/5/2021 10:08:37 AM Not ready

 11/05/2021SHEARWALL/B.W.P.-EXTRICHARD PRATTFAILAM INSPECTION REQUESTED11/5/2021 7:07:03 AM rpratt changed Inspection Date/Time from 11/05/2021 08:00 AM to 11/05/2021 09:00 AM 11/5/2021 10:08:45 AM 1. Provide 2nd floor shear wall plan and shear transfer details for the 2nd floor. 2. Finish nailing 1st floor shear as marked and required. 3. Re-nail over driven fasteners in the shear walls - as marked and required. 4. Complete interior shear. 5. Recall inspection when completed.

 11/19/2021SHEARWALL/B.W.P.-INTSCOTT YOUNGPASS

 11/19/2021SHEARWALL/B.W.P.-EXTSCOTT YOUNGPASSAM REQUEST

 12/06/2021ROOF NAILRICHARD PRATTPARTIALAM REQUEST12/6/2021 6:45:45 AM Rpratt changed Inspection Date/Time from 12/06/2021 08:00 AM to 12/06/2021 08:30 AM 12/6/2021 11:29:41 AM Truss roof system - Approved

 12/22/2021PGE ELECTRIC TAGSCOTT YOUNGPASS12/20/2021 3:09:01 PM AM PLEASE

 12/22/20214-WAY ROUGH FRAMESCOTT YOUNGFAIL12/20/2021 3:08:47 PM AM PLEASE 12/23/2021 6:10:04 AM 1. DWV test, contractor states it was full this morning. 2. Place sediment trap/drip leg at water heater and furnace. 3.use green ground screw to ground all meta boxes. 4.

 12/23/2021PGE ELECTRIC TAGWOODY TOWNSENDCANCELLED

 12/27/20214-WAY ROUGH FRAMEWOODY TOWNSENDPASS

 01/13/2022GAS TESTLARRY AKERSPASS1/11/2022 2:50:21 PM AM PLEASE ALSO INSPECT PROPANE TANK ;) 1/13/2022 12:13:43 PM Gas test house and gas line to propane tank pressure test and underground gas line approved. Signed off gas tag at main electrical panel

 03/01/2022SHOWER PAN/TUB TESTADAM KINGSLEYPASS057819-01 - Scheduled by IVR.

 05/06/2022**PERMIT FINALRICHARD PRATTFAILeTRAKiT Inspection Request5/2/2022 3:16:37 PM 5/2/2022 3:16 PM TRILOGY CONSTRUCTION INC Contact - Shawn530-966-5106 Contact Name: TRILOGY CONSTRUCTION INC Site Address: 1384 HONEY RUN RD Phone: 5308771180 e-Mail: info@calltrilogy.com 5/6/2022 4:24:09 PM 1. Seal around all exterior penetrations. Garage side 2. Insulate exterior water piping to prevent freezing. 3. Properly fill all deck post bases with nails. 4. Fill deck joist hanger with nails, 5 post from west corner. 5. Replace bad garage circuit GFCI breaker. 6. Provide a cap on the future sink drain in garage. 7. Adjust the anti- tip device for the stove. 8. Provide a Carbon Monoxide Detector on the ground floor. 9. Provide a ladder to inspect the equipment in the downstairs attic. 10. Obtain CalFire and Environmental Health Final Approvals 11. Recall inspection when completed.

 05/19/2022CAL FIRE FINAL INSPECHRIS BOYDPASS

 08/04/2022ENV HEALTH RELEASEPAUL THAOPASS3/5/2021 9:30:43 AM Pending well final for release 7/14/2022 8:59:23 AM Pending well log, disinfection statement, and a site inspection to verify the well head is airtight and a 24"x4" thick well pad is around the casing for final of the building permit. 8/4/2022 8:27:21 AM Septic and well finaled for a 3 bedroom. Pass

 08/04/2022**PERMIT FINALADAM KINGSLEYPASSAM request-see note5/25/2022 10:39:47 AM contact name-john 530-815-1023 5/27/2022 11:56:52 AM Previous corrections are completed except 1. Provide Butte County Environmental Health final clearance.