| ENV HEALTH RELEASE | YVETTE CASTANON | PASS | | |
|
02/28/1850 | NPDES | PWROADS | | VOIDED (RDP 3/23/2022) | 3/23/2022 5:45:47 AM
Inspection voided by RDP.
|
|
03/23/2022 | SETBACKS | RICHARD PRATT | PASS | | 3/23/2022 5:59:17 AM
rpratt changed Inspection Date/Time from 03/23/2022 12:30 PM to 03/23/2022 1:00 PM
3/23/2022 2:33:29 PM
Setbacks checked and approved
|
|
03/23/2022 | FORMS/STEEL/HOLDOWNS | RICHARD PRATT | PASS | eTRAKiT Inspection Request | 3/21/2022 9:53:25 AM
3/21/2022 9:53 AM RED LINE INSTALLATIONS INC
Contact Name: RED LINE INSTALLATIONS INC
Site Address: 4172 ISHI TRL
Phone: 5308916719
e-Mail: PERMIT@REDLINEINSTALL.COM
3/23/2022 5:59:21 AM
rpratt changed Inspection Date/Time from 03/23/2022 12:30 PM to 03/23/2022 1:00 PM
3/23/2022 2:33:33 PM
Forms footings and rebar - Approved
|
|
05/17/2022 | SHEARWALL/B.W.P.-EXT | RICHARD PRATT | FAIL | eTRAKiT Inspection Request | 5/13/2022 12:49:43 PM
5/13/2022 12:49 PM RED LINE INSTALLATIONS INC
Contact Name: RED LINE INSTALLATIONS INC
Site Address: 4172 ISHI TRL
Phone: 5308916719
e-Mail: PERMIT@REDLINEINSTALL.COM
5/17/2022 11:32:54 AM
Install holddowns in the "B" garage portal shear wall onto the Corner post and the Header King Stud, per plan. Currently install back to back on interior stud.
Ext shear wall and nailing installation - Approved
|
|
05/17/2022 | ROOF NAIL | SCOTT YOUNG | CANCELLED | eTRAKiT Inspection Request | 5/13/2022 12:49:43 PM
5/13/2022 12:49 PM RED LINE INSTALLATIONS INC
Contact Name: RED LINE INSTALLATIONS INC
Site Address: 4172 ISHI TRL
Phone: 5308916719
e-Mail: PERMIT@REDLINEINSTALL.COM
|
|
05/18/2022 | ROOF NAIL | RICHARD PRATT | PASS | eTRAKiT Inspection Request | 5/17/2022 11:10:03 AM
5/17/2022 11:10 AM RED LINE INSTALLATIONS INC
Contact Name: RED LINE INSTALLATIONS INC
Site Address: 4172 ISHI TRL
Phone: 5308916719
e-Mail: PERMIT@REDLINEINSTALL.COM
5/18/2022 12:10:52 PM
Truss roof system - Approved
|
|
05/27/2022 | ROUGH ELECTRICAL | SCOTT YOUNG | PASS | eTRAKiT Inspection Request | 5/25/2022 9:26:45 AM
5/25/2022 9:26 AM RED LINE INSTALLATIONS INC
Contact Name: RED LINE INSTALLATIONS INC
Site Address: 4172 ISHI TRL
Phone: 5308916719
e-Mail: PERMIT@REDLINEINSTALL.COM
5/27/2022 5:50:37 PM
Rough electrical good to go.
5/31/2022 6:00:44 AM
Rough electrical good to go.
|
|
05/27/2022 | **PERMIT FINAL | SCOTT YOUNG | FAIL | eTRAKiT Inspection Request | 5/25/2022 7:09:49 AM
5/25/2022 7:09 AM RED LINE INSTALLATIONS INC
Contact Name: RED LINE INSTALLATIONS INC
Site Address: 4172 ISHI TRL
Phone: 5308916719
e-Mail: PERMIT@REDLINEINSTALL.COM
5/31/2022 6:00:49 AM
Not ready for final .
|
|
05/31/2022 | **PERMIT FINAL | RANDALL SMITH | CANCELLED | CUSTOMER CANCELED | 5/25/2022 7:10:57 AM
5/25/2022 7:10 AM RED LINE INSTALLATIONS INC
Contact Name: RED LINE INSTALLATIONS INC
Site Address: 4172 ISHI TRL
Phone: 5308916719
e-Mail: PERMIT@REDLINEINSTALL.COM
|
|
06/08/2022 | **PERMIT FINAL | RANDALL SMITH | FAIL | eTRAKiT Inspection Request | 6/6/2022 7:23:01 AM
6/6/2022 7:23 AM RED LINE INSTALLATIONS INC
Contact Name: RED LINE INSTALLATIONS INC
Site Address: 4172 ISHI TRL
Phone: 5308916719
e-Mail: PERMIT@REDLINEINSTALL.COM
6/8/2022 5:01:08 PM
Final
1. Provide final approval from Cal-Fire.
2. Make corrections on 4 way inspection.
3. Call for reinspection when completed.
4 way inspection
1. Install anchor bolt on left front side of the garage.
2. Provide a ladder for inspection of A35 clips on end trusses. Missing entire right side.
*- Install holddowns in the %34B%34 garage portal shear wall onto the Corner post and the Header King Stud, per plan. Currently install back to back on interior stud. 6/8/2022 Streamline engineer certification of epoxy hold down . Letter in attachments.
|
|
06/08/2022 | 4-WAY ROUGH FRAME | RANDALL SMITH | FAIL | | 6/8/2022 5:02:11 PM
4 way inspection
1. Install anchor bolt on left front side of the garage.
2. Provide a ladder for inspection of A35 clips on end trusses. Missing entire right side.
*- Install holddowns in the %34B%34 garage portal shear wall onto the Corner post and the Header King Stud, per plan. Currently install back to back on interior stud. 6/8/2022 Streamline engineer certification of epoxy hold down . Letter in attachments.
|
|
06/09/2022 | CAL FIRE FINAL INSPE | CHRIS BOYD | PASS | | |
|
| **PERMIT FINAL | SCOTT YOUNG | PASS | eTRAKiT Inspection Request | 6/9/2022 11:53:56 AM
6/9/2022 11:53 AM RED LINE INSTALLATIONS INC
Contact Name: RED LINE INSTALLATIONS INC
Site Address: 4172 ISHI TRL
Phone: 5308916719
e-Mail: PERMIT@REDLINEINSTALL.COM
6/14/2022 7:03:55 AM
all previous inspections have been completed
|
|
06/23/2022 | **PERMIT FINAL | SCOTT YOUNG | PASS | eTRAKiT Inspection Request | 6/9/2022 7:16:50 AM
6/9/2022 7:16 AM RED LINE INSTALLATIONS INC
Contact Name: RED LINE INSTALLATIONS INC
Site Address: 4172 ISHI TRL
Phone: 5308916719
e-Mail: PERMIT@REDLINEINSTALL.COM
6/13/2022 1:51:33 PM
All corrections have been completed.
6/14/2022 6:23:37 AM
Previous corrections have been completed.
6/14/2022 6:26:26 AM
All corrections have been completed.
6/14/2022 6:42:31 AM
All previous corrections have been completed.
|
|