05/04/2024
5:25 AM

Butte County
Department of Development Services

Main: 530.552.3700
Automated Inspection Phone Line: 530.538.4365
Online Inspection Scheduling / Payments / Renewals:
ButteCounty.net/DDS

 
Permit No. B20-1959 Permit Type   MISCELLANEOUS Site Address   4172 ISHI TRL
CONCOW, CA 95965
Applied   07/13/2020 Applicant   RUTH JONES
Approved   08/04/2020 Owner   HUTTON VINCENT KYLE & PEGGY JEAN
Issued   08/04/2020 Contractor   RED LINE INSTALLATIONS INC
Parent Permit No.   Description   DETACHED GARAGE (750) COV (580) W/ ELEC
  Notes  
 
  Date of Inspection Inspection Type Inspector Result Remarks Notes

ENV HEALTH RELEASEYVETTE CASTANONPASS

 02/28/1850NPDESPWROADSVOIDED (RDP 3/23/2022)3/23/2022 5:45:47 AM Inspection voided by RDP.

 03/23/2022SETBACKSRICHARD PRATTPASS3/23/2022 5:59:17 AM rpratt changed Inspection Date/Time from 03/23/2022 12:30 PM to 03/23/2022 1:00 PM 3/23/2022 2:33:29 PM Setbacks checked and approved

 03/23/2022FORMS/STEEL/HOLDOWNSRICHARD PRATTPASSeTRAKiT Inspection Request3/21/2022 9:53:25 AM 3/21/2022 9:53 AM RED LINE INSTALLATIONS INC Contact Name: RED LINE INSTALLATIONS INC Site Address: 4172 ISHI TRL Phone: 5308916719 e-Mail: PERMIT@REDLINEINSTALL.COM 3/23/2022 5:59:21 AM rpratt changed Inspection Date/Time from 03/23/2022 12:30 PM to 03/23/2022 1:00 PM 3/23/2022 2:33:33 PM Forms footings and rebar - Approved

 05/17/2022SHEARWALL/B.W.P.-EXTRICHARD PRATTFAILeTRAKiT Inspection Request5/13/2022 12:49:43 PM 5/13/2022 12:49 PM RED LINE INSTALLATIONS INC Contact Name: RED LINE INSTALLATIONS INC Site Address: 4172 ISHI TRL Phone: 5308916719 e-Mail: PERMIT@REDLINEINSTALL.COM 5/17/2022 11:32:54 AM Install holddowns in the "B" garage portal shear wall onto the Corner post and the Header King Stud, per plan. Currently install back to back on interior stud. Ext shear wall and nailing installation - Approved

 05/17/2022ROOF NAILSCOTT YOUNGCANCELLEDeTRAKiT Inspection Request5/13/2022 12:49:43 PM 5/13/2022 12:49 PM RED LINE INSTALLATIONS INC Contact Name: RED LINE INSTALLATIONS INC Site Address: 4172 ISHI TRL Phone: 5308916719 e-Mail: PERMIT@REDLINEINSTALL.COM

 05/18/2022ROOF NAILRICHARD PRATTPASSeTRAKiT Inspection Request5/17/2022 11:10:03 AM 5/17/2022 11:10 AM RED LINE INSTALLATIONS INC Contact Name: RED LINE INSTALLATIONS INC Site Address: 4172 ISHI TRL Phone: 5308916719 e-Mail: PERMIT@REDLINEINSTALL.COM 5/18/2022 12:10:52 PM Truss roof system - Approved

 05/27/2022ROUGH ELECTRICALSCOTT YOUNGPASSeTRAKiT Inspection Request5/25/2022 9:26:45 AM 5/25/2022 9:26 AM RED LINE INSTALLATIONS INC Contact Name: RED LINE INSTALLATIONS INC Site Address: 4172 ISHI TRL Phone: 5308916719 e-Mail: PERMIT@REDLINEINSTALL.COM 5/27/2022 5:50:37 PM Rough electrical good to go. 5/31/2022 6:00:44 AM Rough electrical good to go.

 05/27/2022**PERMIT FINALSCOTT YOUNGFAILeTRAKiT Inspection Request5/25/2022 7:09:49 AM 5/25/2022 7:09 AM RED LINE INSTALLATIONS INC Contact Name: RED LINE INSTALLATIONS INC Site Address: 4172 ISHI TRL Phone: 5308916719 e-Mail: PERMIT@REDLINEINSTALL.COM 5/31/2022 6:00:49 AM Not ready for final .

 05/31/2022**PERMIT FINALRANDALL SMITHCANCELLEDCUSTOMER CANCELED5/25/2022 7:10:57 AM 5/25/2022 7:10 AM RED LINE INSTALLATIONS INC Contact Name: RED LINE INSTALLATIONS INC Site Address: 4172 ISHI TRL Phone: 5308916719 e-Mail: PERMIT@REDLINEINSTALL.COM

 06/08/2022**PERMIT FINALRANDALL SMITHFAILeTRAKiT Inspection Request6/6/2022 7:23:01 AM 6/6/2022 7:23 AM RED LINE INSTALLATIONS INC Contact Name: RED LINE INSTALLATIONS INC Site Address: 4172 ISHI TRL Phone: 5308916719 e-Mail: PERMIT@REDLINEINSTALL.COM 6/8/2022 5:01:08 PM Final 1. Provide final approval from Cal-Fire. 2. Make corrections on 4 way inspection. 3. Call for reinspection when completed. 4 way inspection 1. Install anchor bolt on left front side of the garage. 2. Provide a ladder for inspection of A35 clips on end trusses. Missing entire right side. *- Install holddowns in the %34B%34 garage portal shear wall onto the Corner post and the Header King Stud, per plan. Currently install back to back on interior stud. 6/8/2022 Streamline engineer certification of epoxy hold down . Letter in attachments.

 06/08/20224-WAY ROUGH FRAMERANDALL SMITHFAIL6/8/2022 5:02:11 PM 4 way inspection 1. Install anchor bolt on left front side of the garage. 2. Provide a ladder for inspection of A35 clips on end trusses. Missing entire right side. *- Install holddowns in the %34B%34 garage portal shear wall onto the Corner post and the Header King Stud, per plan. Currently install back to back on interior stud. 6/8/2022 Streamline engineer certification of epoxy hold down . Letter in attachments.

 06/09/2022CAL FIRE FINAL INSPECHRIS BOYDPASS

**PERMIT FINALSCOTT YOUNGPASSeTRAKiT Inspection Request6/9/2022 11:53:56 AM 6/9/2022 11:53 AM RED LINE INSTALLATIONS INC Contact Name: RED LINE INSTALLATIONS INC Site Address: 4172 ISHI TRL Phone: 5308916719 e-Mail: PERMIT@REDLINEINSTALL.COM 6/14/2022 7:03:55 AM all previous inspections have been completed

 06/23/2022**PERMIT FINALSCOTT YOUNGPASSeTRAKiT Inspection Request6/9/2022 7:16:50 AM 6/9/2022 7:16 AM RED LINE INSTALLATIONS INC Contact Name: RED LINE INSTALLATIONS INC Site Address: 4172 ISHI TRL Phone: 5308916719 e-Mail: PERMIT@REDLINEINSTALL.COM 6/13/2022 1:51:33 PM All corrections have been completed. 6/14/2022 6:23:37 AM Previous corrections have been completed. 6/14/2022 6:26:26 AM All corrections have been completed. 6/14/2022 6:42:31 AM All previous corrections have been completed.