07/08/2020 | FOUNDATION/FOOTINGS | SCOTT YOUNG | PASS | 043532-01 MSG! -Msg! Scheduled by IVR. | |
|
07/14/2020 | PRE-SLAB | ADAM KINGSLEY | PASS | 043735-01 - Scheduled by IVR. | |
|
07/23/2020 | UNDERFLOOR FRAMING | WOODY TOWNSEND | PASS | 044052-01 - Scheduled by IVR. | |
|
07/23/2020 | UNDERFLOOR PLUMBING | WOODY TOWNSEND | PASS | | |
|
08/25/2020 | SHEARWALL/B.W.P.-EXT | WOODY TOWNSEND | PASS | 045055-01 MSG! -Msg! Scheduled by IVR. | |
|
08/25/2020 | ROOF NAIL | WOODY TOWNSEND | PASS | | 8/25/2020 2:07:40 PM
Eve roof sheathing is not fire resistant. Fire resistive eves will be required prior to final.
|
|
11/13/2020 | PGE ELECTRIC TAG | SCOTT YOUNG | CANCELLED | NOT READY | 11/12/2020 12:21:48 PM
PM PLEASE
|
|
12/01/2020 | PGE ELECTRIC TAG | WOODY TOWNSEND | PASS | | |
|
12/01/2020 | UNDERGROUND ELECTRIC | WOODY TOWNSEND | PASS | 047860-01 MSG! -Msg! Scheduled by IVR. | 12/1/2020 3:31:28 PM
wtownsend changed Inspection Type from TAG ELECTRIC to UNDERGROUND ELECTRIC
|
|
01/25/2021 | 4-WAY ROUGH FRAME | WOODY TOWNSEND | FAIL | eTRAKiT Inspection Request | 1/21/2021 9:12:47 AM
1/21/2021 9:12 AM Larry Ruby
Afternoon inspection is best but not essential.
Contact Name: Larry Ruby
Site Address: 93 KENDAL CT
Phone: 5306248361
e-Mail: larry@sheratonrem.com
1/25/2021 3:27:57 PM
1. Test abs DWV.
2. Secure DWV at mid span.
3. Install ducts for bath fans.
4. Run individual conductors in conduit at sub panels.
5. Repair or replace over bored studs at sub panel area.
6. Dedicate 20 amp circuit for laundry room.
7. Wire receptacle at over 2' wall in bedroom.
8. Complete water supply plumbing at shower and well pressure tank and test supply pipe.
9. Provide approved truss calcs.
10. Provide approved energy calcs.
11 vent kitchen sink per code.
12. Terminate primary condensate line to exterior.
QII insulation required.
|
|
02/09/2021 | 4-WAY ROUGH FRAME | WOODY TOWNSEND | FAIL | Morning is best if it works. | 2/8/2021 8:32:30 AM
2/8/2021 8:32 AM Larry Ruby
Contact Name: Larry Ruby
Site Address: 93 KENDAL CT
Phone: 5306248361
e-Mail: larry@sheratonrem.com
2/9/2021 3:14:57 PM
1. Provide test on fire sprinklers.
2. Bond gas pipe.
3. Isolate grounding and grounded conductors at sub panel and bond panels.
Okay to insulate walls.
|
|
02/09/2021 | UNDERGROUND PLUMBING | WOODY TOWNSEND | PASS | | 2/9/2021 3:15:46 PM
Water pipe and conduit from well to house.
|
|
02/11/2021 | 4-WAY ROUGH FRAME | WOODY TOWNSEND | PASS | | |
|
04/06/2021 | GAS PIPING | SCOTT YOUNG | PASS | 051104-01 MSG! -Msg! Scheduled by IVR. | |
|
04/09/2021 | UNDERGROUND GAS | ADAM KINGSLEY | PASS | 051293-01 - Scheduled by IVR. | 4/9/2021 8:06:56 AM
PE pipe tank to dwelling, and test -approved. LPG tag issued 325g tank.
|
|
12/21/2021 | ENV HEALTH RELEASE | PAUL THAO | PASS | | 5/27/2020 8:28:26 AM
Pending septic final for release.
12/21/2021 9:01:03 AM
Well and septic finaled. Pass
|
|
12/21/2021 | CAL FIRE FINAL INSPE | CHRIS BOYD | PASS | | |
|
12/22/2021 | **PERMIT FINAL | SCOTT YOUNG | FAIL | AM REQUEST | 12/22/2021 10:50:09 AM
1. Grab bars required at all stair rails.
2. Back deck is at 35" code requires a hand rail over 30"
3. Grading has not been completed around house, areas are pooling and cause for concern.
4. Min. Code requirements are 5% ( 10' out = 6" drop )
5. Have HERS testing completed.
6. Washing machine receptacle must be GFCI, either GFCI receptacle or GFCI BREAKER in the panel.
7. Finish railing in garage
8. All garage receptacles must be GFCI .
9 . Anti syphon / back flow devices required on all exterior hose bibs.
10. Remove all paper/ plastic covering exterior vents.
11. Finish and install underfloor access door.
12. Insulated water lines to water heater lines.
13. Insulate water main entering house.
14. Drip leg / sediment trap required on gas lines at attic furnace and water heater.
12/23/2021 6:09:35 AM
1. Grab bars required at all stair rails.
2. Back deck is at 35" code requires a hand rail over 30"
3. Grading has not been completed around house, areas are pooling and cause for concern.
4. Min. Code requirements are 5% ( 10' out = 6" drop )
5. Have HERS testing completed.
6. Washing machine receptacle must be GFCI, either GFCI receptacle or GFCI BREAKER in the panel.
7. Finish railing in garage
8. All garage receptacles must be GFCI .
9 . Anti syphon / back flow devices required on all exterior hose bibs.
10. Remove all paper/ plastic covering exterior vents.
11. Finish and install underfloor access door.
12. Insulated water lines to water heater lines.
13. Insulate water main entering house.
14. Drip leg / sediment trap required on gas lines at attic furnace and water heater.
|
|
02/04/2022 | **PERMIT FINAL | SCOTT YOUNG | PASS | | 2/3/2022 3:50:24 PM
PM PLEASE
2/4/2022 4:42:11 PM
All corrections have been completed
2/7/2022 6:10:06 AM
All corrections have been completed
|
|