02/28/1850 | NPDES | PWROADS | | VOIDED (MJP2 2/25/2020) | 2/25/2020 9:32:20 AM
Inspection voided by MJP2.
|
|
05/26/2020 | UNDERGROUND ELECTRIC | SCOTT YOUNG | FAIL | 042094-09 - Scheduled by IVR. | 5/26/2020 11:11:21 AM
No underground electrical, it has an arial drop to main.
|
|
05/26/2020 | SKIRTING & STEPS | SCOTT YOUNG | FAIL | 042094-08 - Scheduled by IVR. | 5/26/2020 11:11:28 AM
Stairs front and back need to be enclosed with fire rated hardi board or like material.
|
|
05/26/2020 | MANOMETER TEST | SCOTT YOUNG | FAIL | 042094-06 - Scheduled by IVR. | 5/26/2020 11:11:35 AM
Unable to verify gas line from tank to house. Homeowner has hooked up to propane tank and connected to house, he will need to pot hole and show three locations,proof of depth and tracer wire. Also pressurize and test line.
|
|
05/26/2020 | CONTINUITY TEST | SCOTT YOUNG | FAIL | 042094-07 - Scheduled by IVR. | 5/26/2020 11:11:43 AM
He was unable to get the continuity test to work.
|
|
05/26/2020 | UNDERGROUND WATER PI | SCOTT YOUNG | FAIL | 042094-05 - Scheduled by IVR. | 5/26/2020 11:11:50 AM
Unable to verify, homeowner has placed and covered.pot hole three location to verify .
|
|
05/26/2020 | SEWER(PIPE/TEST/TAP) | SCOTT YOUNG | PASS | 042094-04 - Scheduled by IVR. | |
|
05/26/2020 | PERM FOUNDATION | SCOTT YOUNG | FAIL | 042094-03 - Scheduled by IVR. | 5/26/2020 11:12:05 AM
Homeowner has skirted the entire home. I have asked him to open all four corners of house for next inspection, in order to verify pperm foundation and blocking and underpinning.
|
|
05/26/2020 | BLOCKING/UNDERPINNIN | SCOTT YOUNG | FAIL | 042094-02 - Scheduled by IVR. | 5/26/2020 11:12:12 AM
Home skirted ,unable to verify.
|
|
05/26/2020 | SETBACKS | SCOTT YOUNG | PASS | 042094-01 - Scheduled by IVR. | |
|
05/29/2020 | MANOMETER TEST | SCOTT YOUNG | PASS | 042229-06 - Scheduled by IVR. | |
|
05/29/2020 | SKIRTING & STEPS | SCOTT YOUNG | FAIL | 042229-05 - Scheduled by IVR. | 5/29/2020 11:05:40 AM
Need to add handrails on steps
|
|
05/29/2020 | CONTINUITY TEST | SCOTT YOUNG | FAIL | 042229-04 - Scheduled by IVR. | 5/29/2020 11:05:48 AM
Could not get equipment to work.
|
|
05/29/2020 | UNDERGROUND WATER PI | SCOTT YOUNG | PASS | 042229-03 - Scheduled by IVR. | |
|
05/29/2020 | PERM FOUNDATION | SCOTT YOUNG | PASS | 042229-02 - Scheduled by IVR. | |
|
05/29/2020 | BLOCKING/UNDERPINNIN | SCOTT YOUNG | PASS | 042229-01 - Scheduled by IVR. | |
|
06/02/2020 | SKIRTING & STEPS | WOODY TOWNSEND | PASS | 042333-02 - Scheduled by IVR. | |
|
06/02/2020 | CONTINUITY TEST | WOODY TOWNSEND | PASS | 042333-01 - Scheduled by IVR. | |
|
06/02/2020 | **PERMIT FINAL | WOODY TOWNSEND | FAIL | | 6/2/2020 5:18:01 PM
Submit 433A paperwork to permit center.
Obtain CalFire Final
Provide Electrical connection to building
Install vacuum breaker at hose Bibb.
|
|
06/16/2020 | ENV HEALTH RELEASE | DARREN JONES | PASS | 1 bedroom septic addition | 6/16/2020 10:46:30 AM
house floor plan was permitted for a 2 bedroom + den and the house delivered on site is a 3 bedroom per the owner. septic is currently sized for a 2 bedroom. will require expansion of leach field for release OR convert 1 bedroom to a den. sent email to Jordan DeBrunner in planning regarding the issue.
7/13/2020 10:07:04 AM
I1 bedroom septic expansion finalled. ok to approve and release the building
|
|
| MECHANICAL FINAL | ADAM KINGSLEY | | VOIDED (ALK 7/13/2020) | 7/13/2020 7:26:56 PM
Inspection voided by ALK. Most recent remarks follow: 043644-03 - Scheduled by IVR.
|
|
| ELECTRICAL FINAL | ADAM KINGSLEY | | VOIDED (ALK 7/13/2020) | 7/13/2020 7:27:13 PM
Inspection voided by ALK. Most recent remarks follow: 043644-02 - Scheduled by IVR.
|
|
| PLUMBING FINAL | ADAM KINGSLEY | | VOIDED (ALK 7/13/2020) | 7/13/2020 7:27:33 PM
Inspection voided by ALK. Most recent remarks follow: 043644-04 - Scheduled by IVR.
|
|
07/14/2020 | CAL FIRE FINAL INSPE | JOHN GADDIE | PASS | | 7/14/2020 5:06:11 PM
OK to Final
|
|
07/14/2020 | **PERMIT FINAL | RICHARD PRATT | FAIL W/RE-INSP FEE | 043644-01 - Scheduled by IVR. | 7/14/2020 6:43:54 AM
rpratt changed Inspection Date/Time from 07/14/2020 08:00 AM to 07/14/2020 3:00 PM
7/14/2020 6:54:45 AM
rpratt changed Inspection Date/Time from 07/14/2020 03:00 PM to 07/14/2020 03:30 AM
7/14/2020 6:57:20 AM
rpratt changed Inspection Date/Time from 07/14/2020 03:30 AM to 07/14/2020 3:30 PM
7/14/2020 8:14:03 PM
Terminate the water heater PSI relief valve drain to the exterior of the building not under it.
Insulate the water lines in the water heater closet.
Provide vacuum breakers on the hose bibs
Obtain CalFire final approval.
Complete 433A Documentation with the Permit Center.
Recall inspection when completed and pay re-inspection fee.
|
|
07/15/2020 | 433A | PERMIT CENTER | PASS | | 7/15/2020 2:01:09 PM
GRANT DEED, MCO AND HCD CHECK RECEIVED
7/16/2020 8:29:52 AM
HCD CHECK IN SAFE
|
|
| PLUMBING FINAL | ADAM KINGSLEY | | VOIDED (ALK 7/15/2020) | 7/15/2020 7:53:37 PM
Inspection voided by ALK. Most recent remarks follow: 043809-02 - Scheduled by IVR.
|
|
| ELECTRICAL FINAL | ADAM KINGSLEY | | VOIDED (ALK 7/15/2020) | 7/15/2020 7:53:52 PM
Inspection voided by ALK. Most recent remarks follow: 043809-03 - Scheduled by IVR.
|
|
07/16/2020 | **PERMIT FINAL | SCOTT YOUNG | PASS | 043809-01 - Scheduled by IVR. | 7/16/2020 3:22:07 PM
Corrections have been addressed.
|
|