| LAND DEV FINAL | PWLANDDEV | NOT REQUIRED | | |
|
11/09/2020 | UNDER SLAB PLUMBING | SCOTT YOUNG | FAIL | 047245-01 - Scheduled by IVR. | 11/9/2020 7:03:11 PM
Pipes not holding pressure.
|
|
11/10/2020 | UNDER SLAB PLUMBING | SCOTT YOUNG | PASS | 047324-01 - Scheduled by IVR. | |
|
11/13/2020 | PRE-SLAB | WOODY TOWNSEND | PASS | 047448-01 - Scheduled by IVR. | |
|
11/13/2020 | FOUNDATION/FOOTINGS | WOODY TOWNSEND | PASS | | |
|
12/09/2020 | ROOF NAIL | SCOTT YOUNG | PASS | 048118-01 MSG! -Msg! Scheduled by IVR. | 12/10/2020 6:34:09 AM
Also inspected interior and exterior shearwall.
|
|
12/23/2020 | UNDERGROUND PLUMBING | WOODY TOWNSEND | PASS | 048453-01 - Scheduled by IVR. | 12/23/2020 9:06:57 PM
wtownsend changed Inspection Type from CONDENSATN/IND PPNG to UNDERGROUND PLUMBING
12/28/2020 2:00:37 PM
Sewer drain and water main approved to backfill.
|
|
01/12/2021 | STUCCO (LATH) | RICHARD PRATT | PASS | 048862-01 MSG! -Msg! Scheduled by IVR. | 1/12/2021 7:09:09 AM
rpratt changed Inspection Date/Time from 01/12/2021 08:30 AM to 01/12/2021 2:30 PM
1/12/2021 2:36:20 PM
Stucco lath - Approved
|
|
02/10/2021 | 4-WAY ROUGH FRAME | RICHARD PRATT | FAIL | 049640-01 MSG! -Msg! Scheduled by IVR. | 2/10/2021 5:49:28 PM
Install anchor bolts within 12" of and no closer than 3" of each plate break - multiple- as marked and required.
Provide fire blocking at the wall to stove exhaust vent chase to the attic.
Provide nail plate protection for NM Cable - Middle office hallway, North side.
Provide backing for toilet paper dispensers in both bathrooms.
Provide an offset flange for the water closet prior to final. Water closet centerline to wall clearance 17" - 19".
Protect the line set from wearing thru the nail plate - Northeast corner office.
Recall inspection when completed.
|
|
02/10/2021 | 4-WAY ROUGH FRAME | RICHARD PRATT | PASS | | 2/10/2021 5:50:44 PM
All items completed. (Except offset flange- recheck at final)
|
|
07/06/2021 | FIRE MARSHAL CLEARAN | CHRIS BOYD | PASS | | |
|
07/14/2021 | **PERMIT FINAL | RICHARD PRATT | FAIL | 053271-01 - Scheduled by IVR. | 7/14/2021 6:35:47 AM
rpratt changed Inspection Date/Time from 07/14/2021 08:00 AM to 07/14/2021 10:30 AM
7/14/2021 12:12:23 PM
Provide tamper resistant caps at both of the condensers.
Separate the copper and the sheet metal and properly seal around the line set to prevent insect intrusion.
Remove or move the 2 plants from in front of the A/C disconnects to allow proper access.
Paint all roof jacks.
Repair stucco at front elevation receptacle box.
Provide an air gap for the dishwasher.
Provide gfci protection for the kitchen receptacles.
Provide Site arrival signage for tow from accessible parking.
Provide Acceptance Letter for all interior lighting, vacancy sensors and outdoor lighting.
Recall inspection when completed.
|
|
07/16/2021 | ENV HEALTH RELEASE | DARREN JONES | PASS | | 3/16/2020 8:54:22 AM
HOLD RELEASE FOR WATER ISSUES, SEPTIC FINAL AND DESTRUCT
7/16/2021 9:27:55 AM
Septic finaled and tanks where removed. Pass
|
|
08/04/2021 | **PERMIT FINAL | ADAM KINGSLEY | FAIL | 053715-01 - Scheduled by IVR. | 8/4/2021 11:52:45 AM
Previous corrections are completed except
1. Provide NRCA forms (interior & exterior lighting controls and mechanical ventilation).
|
|
08/09/2021 | **PERMIT FINAL | ADAM KINGSLEY | PASS | | 8/9/2021 6:08:56 AM
PREVIOUS CORRECTIONS COMPLETED. FORMS ATTACHED.
|
|