11/13/2019 | ENV HEALTH RELEASE | VANCE SEVERIN | PASS | | |
|
02/28/1850 | NPDES | QUENTIN CARTER | | VOIDED (SLN 11/26/2019) | 11/26/2019 2:05:04 PM
Inspection voided by SLN.
|
|
01/22/2020 | SETBACKS | ADAM KINGSLEY | PASS | | |
|
01/22/2020 | FOUNDATION/FOOTINGS | ADAM KINGSLEY | PASS | | 1/22/2020 12:42:23 PM
Concrete foundation. Interior pier footings included
|
|
02/11/2020 | BLOCKING/UNDERPINNIN | SCOTT YOUNG | PASS | 038904-01 - Scheduled by IVR. | 8/5/2020 11:33:39 AM
Permanent foundation approved.
|
|
02/12/2020 | **PERMIT FINAL | SCOTT YOUNG | FAIL | 038941-03 - Scheduled by IVR. | 2/12/2020 1:18:26 PM
Main panel not complete, main panel on exterior of house had two knockouts exposed with no breakers or blank cover.
2/12/2020 1:33:32 PM
Main panel not complete, main panel on exterior of house had two knockouts exposed with no breakers or blank cover.
2/12/2020 1:52:46 PM
Main panel not complete, main panel on exterior of house had two knockouts exposed with no breakers or blank cover.
|
|
02/12/2020 | UNDERGROUND WATER PI | SCOTT YOUNG | PASS | 038941-02 - Scheduled by IVR. | |
|
02/12/2020 | SEWER(PIPE/TEST/TAP) | SCOTT YOUNG | PASS | 038941-01 - Scheduled by IVR. | |
|
02/13/2020 | PGE ELECTRIC TAG | WOODY TOWNSEND | PASS | 039037-01 - Scheduled by IVR. | 2/13/2020 2:54:30 PM
wtownsend changed Inspection Type from **PERMIT FINAL to PGE ELECTRIC TAG
|
|
02/18/2020 | PIER/COLUMN FOOTINGS | SCOTT YOUNG | FAIL | 039133-01 MSG! -Msg! Scheduled by IVR. | 2/18/2020 1:41:26 PM
Inspection was for the footings for the back deck. There were not ready, still had 6 piers to dig.
2/18/2020 1:46:28 PM
Inspection was for the footings for the back deck. There were not ready, still had 6 piers to dig.
|
|
02/20/2020 | PIER/COLUMN FOOTINGS | SCOTT YOUNG | PASS | 039233-01 - Scheduled by IVR. | 2/20/2020 2:15:33 PM
Piers for back deck.
|
|
05/20/2020 | **PERMIT FINAL | ADAM KINGSLEY | FAIL | | 5/20/2020 4:20:53 PM
Previous final inspection correction addressed. The following added:
1. CalFire final clearance required.
2. Records do not indicate an electric continuity test was completed. Please provide a copy of the job site inspection card or perform the test with an inspector present or equal.
3. 433A documents not received. Provide a copy of MH manufacturers certificate of origin & grant deed to the Building Dept.
8/5/2020 11:27:16 AM
corrections 1 and 2 complete.
Final pending 433A approval.
|
|
02/13/2020 | CONTINUITY TEST | WOODY TOWNSEND | PASS | | |
|
07/13/2020 | CAL FIRE FINAL INSPE | JOHN GADDIE | PASS | | 7/13/2020 5:34:48 PM
OK to Final
|
|
08/11/2020 | 433A | PERMIT CENTER | PASS | | 6/9/2020 12:45:59 PM
GRANT DEED AND MCO RECEIVED
8/11/2020 2:23:27 PM
HCD CHECK IN REGISTER
|
|
08/11/2020 | **PERMIT FINAL | DSINSPECTION | PASS | ALL CONDITIONS HAVE BEEN MET | |
|