| ENV HEALTH RELEASE | YVETTE CASTANON | PASS | | |
|
02/28/1850 | NPDES | QUENTIN CARTER | | VOIDED (SLN 11/26/2019) | 11/26/2019 1:51:57 PM
Inspection voided by SLN.
|
|
02/13/2020 | FOUNDATION/FOOTINGS | WOODY TOWNSEND | FAIL | eTRAKiT Inspection Request | 2/12/2020 2:40:50 PM
2/12/2020 2:40 PM RED LINE INSTALLATIONS INC
Contact Name: RED LINE INSTALLATIONS INC
Site Address: 6287 BREVARD CIR
Phone: 5308916719
e-Mail: PERMIT@REDLINEINSTALL.COM
2/13/2020 2:54:22 PM
Locate property lines so setbacks can be verified. Foundation inspection not started until PL located.
|
|
02/20/2020 | FOUNDATION/FOOTINGS | SCOTT YOUNG | PASS | 039228-01 - Scheduled by IVR. | 2/20/2020 1:07:38 PM
Lot has been surveyed and pins placed, set backs ok.
Verified eupher ground at laundry room .
|
|
| 433A | PERMIT CENTER | PASS | | |
|
05/01/2020 | CONTINUITY TEST | SCOTT YOUNG | PASS | 041412-03 - Scheduled by IVR. | 5/1/2020 6:48:50 AM
syoung changed Inspection Date/Time from 05/01/2020 08:00 AM to 05/01/2020 12:00 PM
|
|
05/01/2020 | MANOMETER TEST | SCOTT YOUNG | PASS | 041412-02 - Scheduled by IVR. | 5/1/2020 6:48:55 AM
syoung changed Inspection Date/Time from 05/01/2020 08:00 AM to 05/01/2020 12:00 PM
|
|
05/01/2020 | BLOCKING/UNDERPINNIN | SCOTT YOUNG | PASS | 041412-01 - Scheduled by IVR. | 5/1/2020 6:49:00 AM
syoung changed Inspection Date/Time from 05/01/2020 08:00 AM to 05/01/2020 12:00 PM
|
|
05/22/2020 | SITE UTILITIES | ADAM KINGSLEY | PARTIAL | eTRAKiT Inspection Request | 5/20/2020 2:04:18 PM
5/20/2020 2:04 PM RED LINE INSTALLATIONS INC
Contact Name: RED LINE INSTALLATIONS INC
Site Address: 6287 BREVARD CIR
Phone: 5308916719
e-Mail: PERMIT@REDLINEINSTALL.COM
5/22/2020 12:35:28 PM
Underground gas MH to tank, test & lpg tag approved
Underground water supply to meter approved
|
|
| ROUGH FRAME | ADAM KINGSLEY | | VOIDED (ALK 7/13/2020) | 7/10/2020 4:25:09 PM
7/10/2020 4:25 PM RED LINE INSTALLATIONS INC
Contact Name: RED LINE INSTALLATIONS INC
Site Address: 6287 BREVARD CIR
Phone: 5308916719
e-Mail: PERMIT@REDLINEINSTALL.COM
7/13/2020 7:53:22 PM
Inspection voided by ALK. Most recent remarks follow: eTRAKiT Inspection Request
|
|
| ROUGH ELECTRICAL | ADAM KINGSLEY | | VOIDED (ALK 7/13/2020) | 7/10/2020 4:25:09 PM
7/10/2020 4:25 PM RED LINE INSTALLATIONS INC
Contact Name: RED LINE INSTALLATIONS INC
Site Address: 6287 BREVARD CIR
Phone: 5308916719
e-Mail: PERMIT@REDLINEINSTALL.COM
7/13/2020 7:54:31 PM
Inspection voided by ALK. Most recent remarks follow: eTRAKiT Inspection Request
|
|
09/16/2020 | CAL FIRE FINAL INSPE | CHRIS BOYD | PASS | | |
|
09/17/2020 | **PERMIT FINAL | RICHARD PRATT | FAIL | 045640-01 - Scheduled by IVR. | 9/17/2020 6:54:23 AM
rpratt changed Inspection Date/Time from 09/17/2020 08:00 AM to 09/17/2020 12:30 PM
9/17/2020 6:55:55 AM
rpratt changed Inspection Date/Time from 09/17/2020 08:00 AM to 09/17/2020 12:30 PM
9/17/2020 6:23:01 PM
Provide a elbows at plumbing terminations and the AC disconnect at the exterior of the building.
Seal around all penetrations in the building and skirting.
Provide tamper resistant caps at the condenser.
Provide 8 Gauge wire to the AC disconnect, fuses are 35A.
Terminate the Hot water heater PSI relief valve drain to to the exterior.
Install propane tank and verify hot water to the building, and fuel for stove.
Recall inspection when completed
DWV flow test completed and approved.
|
|
09/24/2020 | **PERMIT FINAL | ADAM KINGSLEY | PASS | eTRAKiT Inspection Request | 9/22/2020 1:28:19 PM
9/22/2020 1:28 PM RED LINE INSTALLATIONS INC
Contact Name: RED LINE INSTALLATIONS INC
Site Address: 6287 BREVARD CIR
Phone: 5308916719
e-Mail: PERMIT@REDLINEINSTALL.COM
9/24/2020 2:55:28 PM
Previous corrections are completed.
Retagged LPG.
|
|