| CAL FIRE FINAL INSPE | CHRIS BOYD | | | |
|
| ENV HEALTH RELEASE | KATTY HERNANDEZ | | HOLD FOR SEPTIC & WELL FINAL | 3/1/2022 1:45:24 PM
SEPTIC FINALED, PENDING FINAL OF WELL - WILL NEED DISINFECTION STATEMENT AND WELL LOG
|
|
08/06/2020 | FOUNDATION/FOOTINGS | SCOTT YOUNG | PASS | | |
|
10/29/2020 | NPDES | ADAM KINGSLEY | PASS | | |
|
10/29/2020 | MASONRY LIFTS | ADAM KINGSLEY | PARTIAL | | 10/29/2020 2:35:18 PM
CMU 1st lift (four courses) -approved.
|
|
12/11/2020 | MASONRY LIFTS | SCOTT YOUNG | PASS | | 12/14/2020 6:51:17 AM
Second lift 7 courses.
12/14/2020 6:54:16 AM
Second lift 7 courses.
12/14/2020 6:59:50 AM
Second lift 7 courses.
12/14/2020 7:05:17 AM
Second lift 7 courses.
12/14/2020 7:09:46 AM
Second lift 7 courses.
|
|
02/05/2021 | BLOCKING/UNDERPINNIN | SCOTT YOUNG | PASS | | 2/5/2021 11:46:12 AM
3rd course. - four blocks high.
|
|
03/29/2021 | MASONRY LIFTS | WOODY TOWNSEND | PARTIAL | | 3/29/2021 5:58:32 PM
wtownsend changed Inspection Type from BLOCKING/UNDERPINNIN to MASONRY LIFTS
3/29/2021 6:00:15 PM
4th 4 block lift approved.
|
|
05/21/2021 | CMU 1ST POUR | RICHARD PRATT | PASS | | 5/21/2021 7:00:43 AM
Rpratt changed Inspection Date/Time from 05/21/2021 08:00 AM to 05/21/2021 2:00 PM
5/21/2021 5:02:42 PM
CMU wall, 5th pour to wall top plates, still need gable ends - Approved
|
|
06/25/2021 | CMU 1ST POUR | SCOTT YOUNG | PASS | | 6/25/2021 9:32:57 AM
syoung changed Inspection Type from ROOF FRAME/SHEATHING to CMU 1ST POUR
6/28/2021 6:04:36 AM
This inspection was actually for the gable end lifts .
Staggered blocking ,approx. 7 bocks high at the ridge .
6/28/2021 6:07:22 AM
This inspection was actually for the gable end lifts .
Staggered blocking ,approx. 7 bocks high at the ridge .
|
|
07/30/2021 | ROUGH FRAME | RICHARD PRATT | PASS | | 7/30/2021 6:45:43 AM
rpratt changed Inspection Date/Time from 07/30/2021 08:00 AM to 07/30/2021 4:30 PM
7/30/2021 5:30:59 PM
Underfloor framing - Approved
|
|
11/12/2021 | ROOF FRAME/SHEATHING | SCOTT YOUNG | FAIL | | 11/12/2021 5:42:43 PM
Not ready.
|
|
11/24/2021 | ROOF FRAME/SHEATHING | RICHARD PRATT | CANCELLED | | 11/24/2021 6:54:48 AM
rpratt changed Inspection Date/Time from 11/24/2021 08:00 AM to 11/24/2021 12:00 PM
11/24/2021 12:57:37 PM
No sheathing installed - canceled
|
|
12/06/2021 | ROOF FRAME/SHEATHING | RICHARD PRATT | PASS | | 12/6/2021 6:45:18 AM
Rpratt changed Inspection Date/Time from 12/06/2021 08:00 AM to 12/06/2021 12:00 PM
12/6/2021 1:22:06 PM
Roof sheathing -
|
|
01/21/2022 | ROUGH ELECTRICAL | WOODY TOWNSEND | PARTIAL | | 1/21/2022 4:06:06 PM
Underfloor conduit to sub panel.
|
|
01/21/2022 | UNDERFLOOR PLUMBING | WOODY TOWNSEND | PASS | | 1/21/2022 4:05:59 PM
wtownsend changed Inspection Type from ROUGH PLUMBING to UNDERFLOOR PLUMBING
|
|
03/24/2023 | ROOF NAIL | CHRISTOPHER ROBERTS | PASS | | 3/24/2023 6:25:55 AM
croberts changed Inspection Date/Time from 03/24/2023 08:00 AM to 03/24/2023 11:00 AM
3/24/2023 11:28:38 AM
Roof nail - Approved
|
|
03/24/2023 | ROOF FRAME/SHEATHING | CHRISTOPHER ROBERTS | CANCELLED | | 3/24/2023 6:26:03 AM
croberts changed Inspection Date/Time from 03/24/2023 08:00 AM to 03/24/2023 11:00 AM
|
|
08/04/2023 | 4-WAY ROUGH FRAME | RAYMOND SANDOVAL | FAIL | | 8/4/2023 11:13:30 AM
Not ready for inspection.
Complete all rough trades
Extensive courtesy walk performed with homeowner.
Move all materials away from walls for inspection.
|
|
09/08/2023 | 4-WAY ROUGH FRAME | RAYMOND SANDOVAL | FAIL | | 9/8/2023 1:50:34 PM
1. Complete rough plumbing at bathroom.
2. install backing at kitchen lids.
3.install fireplace flue vent pipe through roof sheeting.
4.secure electrical panel
5. Obtain fire sprinkler clearance.
6. Add strap to top plate breaks within 24" of each other.
7. Seal penetrations in top plates and sill plates.
|
|
09/22/2023 | 4-WAY ROUGH FRAME | RICHARD PRATT | PASS | | 9/22/2023 7:02:54 AM
rpratt changed Inspection Date/Time from 09/22/2023 08:00 AM to 09/22/2023 11:30 AM
9/22/2023 2:49:46 PM
4 way frame and trades - Approved
|
|
10/27/2023 | SHOWER PAN/TUB TEST | WOODY TOWNSEND | PASS | | |
|