| NPDES | QUENTIN CARTER | | | |
|
08/29/2019 | ENV HEALTH RELEASE | VANCE SEVERIN | PASS | | |
|
09/13/2019 | SERVICE PANEL | SCOTT YOUNG | PASS | 033728-01 - Scheduled by IVR. | |
|
09/19/2019 | FOUNDATION/FOOTINGS | WOODY TOWNSEND | FAIL | | 9/19/2019 3:49:25 PM
1. Provide fix to comply with front yard 20' setbacks. Front porch foundation is 1'9" into setback.
2. Provide revision from engineer for front porch footings as built. As built isn't per approved detail.
|
|
09/20/2019 | FOUNDATION/FOOTINGS | WOODY TOWNSEND | PASS | | 9/20/2019 8:11:08 AM
Received engineers letter to reduce depth of front porch by 2' to comply with setbacks.
|
|
09/24/2019 | PRE-SLAB | WOODY TOWNSEND | PASS | | 9/24/2019 2:26:03 PM
Install vapor barrier.
9/25/2019 9:20:28 AM
Vapor barrier installed
|
|
10/21/2019 | SHEARWALL/B.W.P.-EXT | WOODY TOWNSEND | FAIL | | 10/21/2019 3:51:00 PM
1. Shear nail bottom plate at #4 8' living room shear and #6 32' master/bedroom 2 shear.
2. Several anchor bolts under floor need square washers.
3. Install a35/RBC shear transfer at eaves and gable ends per shear schedule in addition to h2.5 per detail sd4/7.
|
|
10/21/2019 | ROOF NAIL | WOODY TOWNSEND | FAIL | | 10/21/2019 3:51:08 PM
1. Provide extension ladder and approved truss calcs for roof nail inspection.
|
|
10/25/2019 | SHEARWALL/B.W.P.-EXT | PHILLIP MYERS | PASS | | |
|
10/25/2019 | ROOF FRAME/SHEATHING | PHILLIP MYERS | PASS | | |
|
12/06/2019 | 4-WAY ROUGH FRAME | ADAM KINGSLEY | FAIL | | 12/6/2019 1:30:50 PM
1. Approved energy calculations not provided for inspection.
2. Tub drain/ floor penetration exposes underfloor. Provide rat proofing (1/4" wire mesh or equal) to seal annular space around pipes.
3. Grounding terminal bar not bonded to metal sub panel enclosure. Install bonding screw or equal.
4. Roof drip edge flashing no provided, exposed roof sheathing edges. Install required flashing or equal.
5. Provide min 30" x 30" platform at service (control panel) side of attic HVAC equipment with min 24" wide unobstructed catwalk to access. Platform compromised by whole house fan, catwalk comprised by HVAC ducting.
|
|
12/11/2019 | 4-WAY ROUGH FRAME | MIKE KNIGHT | PARTIAL | | 12/11/2019 4:16:19 PM
All corrections from 12-6-19 addressed except #4, need 2" roof edge flashing per prior correction.
|
|
02/20/2020 | SHOWER PAN/TUB TEST | SCOTT YOUNG | FAIL | | 2/20/2020 1:07:32 PM
Bladder leaked over night. Shower pan dry. Fill and call for reinspection.
|
|
02/24/2020 | SHOWER PAN/TUB TEST | WOODY TOWNSEND | PASS | | |
|
12/06/2019 | UNDERFLOOR FRAMING | ADAM KINGSLEY | PASS | | |
|
12/06/2019 | UNDERFLOOR PLUMBING | ADAM KINGSLEY | PASS | | |
|
04/16/2020 | GAS TEST | ADAM KINGSLEY | PASS | | 4/16/2020 6:26:35 AM
akingsley changed Inspection Date/Time from 04/16/2020 08:00 AM to 04/16/2020 2:00 PM
4/16/2020 2:29:32 PM
Whole system
|
|
04/16/2020 | **PERMIT FINAL | ADAM KINGSLEY | VOID | | 4/16/2020 6:26:41 AM
akingsley changed Inspection Date/Time from 04/16/2020 08:00 AM to 04/16/2020 2:00 PM
4/16/2020 2:29:39 PM
Not ready.
|
|
04/16/2020 | TAG LPG | ADAM KINGSLEY | PASS | | 4/16/2020 6:26:28 AM
akingsley changed Inspection Date/Time from 04/16/2020 08:00 AM to 04/16/2020 2:00 PM
4/16/2020 2:29:25 PM
akingsley changed Inspection Type from PGE GAS TAG to TAG LPG
4/16/2020 2:59:36 PM
250G LPG
|
|
04/22/2020 | CAL FIRE FINAL INSPE | CHRIS BOYD | PASS | | 4/22/2020 1:16:21 PM
OK to Final
|
|
05/05/2020 | **PERMIT FINAL | ADAM KINGSLEY | FAIL | | 5/5/2020 10:51:26 AM
1. Energy compliance documents not completed. Update CA energy registry to show project completed.
2. GFCI receptacle located to the right of the kitchen range tests open ground.
3. Provide min single luminaire controlled by vacancy sensor or equal in both bathrooms.
4. Provide humidistat control for environmental exhaust fans in both bathrooms.
5. Stairs from exterior deck to ground missing required handrail. Provide graspable handrail 34"-38" above stair tread nosing or equal.
|
|
05/08/2020 | **PERMIT FINAL | WOODY TOWNSEND | PASS | | |
|