07/17/2019 | FOUNDATION/FOOTINGS | WOODY TOWNSEND | PARTIAL | 031112-01 - Scheduled by IVR. | 7/18/2019 8:06:35 AM
Retaining wall footings approved.
|
|
07/24/2019 | FOUNDATION/FOOTINGS | ADAM KINGSLEY | PARTIAL | 031378-01 - Scheduled by IVR. | 7/24/2019 2:58:09 PM
Perimeter foundation only except Blocked out area around basement walls (approx 10'' not completed.) Blocked out locations noted on approved jobsite plans.
1. Boulder protruding into footing at North wall. Provide EOR written approval or fix. Contractor stated EOR was notified, letter for pinning foundation to boulder is en route.
6/18/2020 8:27:48 AM
LETTER RECEIVED VIA EMAIL AND ATTACHED. FOOTINGS APPROVED.
|
|
07/24/2019 | UNDER SLAB PLUMBING | ADAM KINGSLEY | PASS | | 7/24/2019 2:58:30 PM
1st floor slab area only.
|
|
08/02/2019 | PIER/COLUMN FOOTINGS | SCOTT YOUNG | PASS | 031776-01 MSG! -Msg! Scheduled by IVR. | 8/2/2019 3:54:55 PM
Inspection was for wine room retaining walls
|
|
08/15/2019 | PRE-SLAB | ADAM KINGSLEY | PASS | 032390-01 - Scheduled by IVR. | |
|
10/15/2019 | PW FINAL | ROAD DISTRICT 1 | PASS | | |
|
11/05/2019 | PGE ELECTRIC TAG | WOODY TOWNSEND | PASS | Requesting panel inspection | 11/3/2019 3:35:18 PM
11/3/2019 3:35 PM Cody Anderson
Panel inspection for Pge hook up. Job card and site plans located in well shed. Gate code is 7442# requesting AM please call if any questions 591-7442
Contact Name: Cody Anderson
Site Address: 3067 PENTZ RD
Phone: 5305917442
e-Mail: Candersonbros@gmail.com
11/5/2019 3:27:16 PM
Approval for one 200 amp service. Provide Butte County approval through permit center for second 200 amp service.
|
|
11/06/2019 | PGE ELECTRIC TAG | SCOTT YOUNG | PASS | | 11/5/2019 4:38:02 PM
Panel inspection for Pge hook up. Job card and site plans located in well shed. Gate code is 7442#
11/5/2019 4:39:32 PM
2 meters approved on site plan.
|
|
11/25/2019 | ROOF NAIL | PHILLIP MYERS | PASS | 036423-01 - Scheduled by IVR. | 11/25/2019 10:54:01 AM
Roof & Exterior shear nailing ok. Ok to set windows... However at fireplace, provide missing hold down for shear on the interior as shown on plans.
|
|
11/25/2019 | SHEAR TRANSFER | PHILLIP MYERS | PASS | | |
|
11/25/2019 | SHEARWALL/B.W.P.-EXT | PHILLIP MYERS | PASS | | |
|
11/25/2019 | SHEARWALL/B.W.P.-INT | PHILLIP MYERS | FAIL | | 11/26/2019 8:34:08 AM
Interior shear walls are in as specified on approved plans... However one foundation hold down at the fireplace at is not in at time of this inspection. Please provide wet stamp engineer fix for this missing hold down.
|
|
02/13/2020 | UNDERGROUND PLUMBING | WOODY TOWNSEND | PASS | | 2/13/2020 2:54:02 PM
wtownsend changed Inspection Type from UNDERGROUND GAS to UNDERGROUND PLUMBING
2/13/2020 3:20:47 PM
2" well to house.
|
|
02/13/2020 | UNDERGROUND CONDUIT | WOODY TOWNSEND | PASS | | 2/13/2020 3:02:32 PM
wtownsend changed Inspection Type from UNDERGROUND ELECTRIC to UNDERGROUND CONDUIT
2/13/2020 3:22:34 PM
3" and two 2" main to house.
Two 3" and one 2" from main to garage. No elec. on garage permit.
|
|
02/18/2020 | FIRE SPRINKLERS | SCOTT YOUNG | CANCELLED | 039132-02 - Scheduled by IVR. | |
|
02/18/2020 | 4-WAY ROUGH FRAME | SCOTT YOUNG | FAIL | 039132-01 - Scheduled by IVR. | 2/18/2020 1:41:04 PM
Ground main panel.
Water and gas bond.
Pex's water line had nail through it, in master bath.
Copper crimps on all ground pass thru's
2nd floor DWV all dry.
Condensate lines not finished,do not terminate to exterior.
No stamped approved truss calc's onsite.
Need Simpson brackets/ straps at post and beams at front porch.
List screw for all metal receptacles
2/18/2020 1:46:01 PM
Ground main panel.
Water and gas bond.
Pex's water line had nail through it, in master bath.
Copper crimps on all ground pass thru's
2nd floor DWV all dry.
Condensate lines not finished,do not terminate to exterior.
No stamped approved truss calc's onsite.
Need Simpson brackets/ straps at post and beams at front porch.
List screw for all metal receptacles
|
|
02/20/2020 | 4-WAY ROUGH FRAME | WOODY TOWNSEND | PASS | 039281-01 - Scheduled by IVR. | 2/20/2020 4:01:39 PM
Post beam connection at porches, QII needed prior to final.
|
|
04/09/2020 | CAL FIRE FINAL INSPE | JOHN GADDIE | PASS | | 4/9/2020 11:00:39 AM
OK to Final
|
|
04/22/2020 | SHOWER PAN/TUB TEST | ADAM KINGSLEY | PASS | 041126-01 - Scheduled by IVR. | 4/21/2020 12:04:38 PM
GATE CODE IS 7442#
4/22/2020 5:44:03 AM
akingsley changed Inspection Date/Time from 04/22/2020 08:00 AM to 04/22/2020 1:00 PM
|
|
04/22/2020 | GAS TEST | ADAM KINGSLEY | PARTIAL | | 4/22/2020 2:31:09 PM
House test only
|
|
05/13/2020 | UNDERGROUND GAS | ADAM KINGSLEY | PASS | 041744-02 - Scheduled by IVR. | 5/13/2020 12:15:25 PM
To tank location
|
|
05/13/2020 | GAS TEST | ADAM KINGSLEY | PASS | 041744-01 - Scheduled by IVR. | 5/13/2020 12:15:32 PM
Whole system. Lpg tag issued (located in garage sub panel)
|
|
06/04/2020 | ENV HEALTH RELEASE | DARREN JONES | PASS | ok to final | 6/4/2020 9:53:54 AM
septic and well finalled
|
|
06/24/2020 | **PERMIT FINAL | SCOTT YOUNG | FAIL | 043074-01 - Scheduled by IVR. | 6/24/2020 6:25:38 PM
syoung changed Inspection Type from **PERMIT FINAL to **PROJECT FINAL
6/24/2020 7:42:03 PM
syoung changed Inspection Type from **PERMIT FINAL to **PROJECT FINAL
6/25/2020 6:09:23 AM
syoung changed Inspection Type from **PERMIT FINAL to **PROJECT FINAL
6/25/2020 6:11:57 AM
syoung changed Inspection Type from **PERMIT FINAL to **PROJECT FINAL
6/25/2020 6:15:35 AM
syoung changed Inspection Type from **PERMIT FINAL to **PROJECT FINAL
|
|
02/28/1850 | NPDES | QUENTIN CARTER | | VOIDED (ALK 6/25/2020) | 6/25/2020 5:51:12 AM
Inspection voided by ALK.
|
|
06/25/2020 | **PERMIT FINAL | ADAM KINGSLEY | PASS | 043167-01 - Scheduled by IVR. | 6/25/2020 1:15:51 PM
Previous corrections are completed
6/25/2020 1:19:17 PM
Previous corrections are completed
|
|