06/07/2019 | PRE-SLAB | MIKE KNIGHT | PASS | 029556-01 MSG! -Msg! Scheduled by IVR. | |
|
06/17/2019 | PGE ELECTRIC TAG | ADAM KINGSLEY | PASS | 029876-01 MSG! -Msg! Scheduled by IVR. | 6/17/2019 10:47:59 AM
Construction power approved
|
|
| NPDES | QUENTIN CARTER | | | |
|
06/06/2019 | FOUNDATION/FOOTINGS | LARRY AKERS | PARTIAL | PM REQUESTED | 6/6/2019 9:16:54 AM
Underground plumbing covered and can not inspect. Under cover and call in fo a inspection before starting on slub.
|
|
07/22/2019 | SHEARWALL/B.W.P.-EXT | ADAM KINGSLEY | PASS | 031307-01 MSG! -Msg! Scheduled by IVR. | 7/22/2019 2:19:46 PM
Interior sw included
|
|
07/22/2019 | ROOF NAIL | ADAM KINGSLEY | PARTIAL | | 7/22/2019 2:19:51 PM
1. Drag truss / top plate connections not completed, missing A35 clips. Ok to proceed & follow up at 4way inspection.
|
|
08/09/2019 | 4-WAY ROUGH FRAME | WOODY TOWNSEND | CANCELLED | Cancelled on 8/9/2019 at 1:49 PM | |
|
08/13/2019 | FIRE SPRINKLERS | MIKE KNIGHT | PASS | | |
|
08/13/2019 | 4-WAY ROUGH FRAME | MIKE KNIGHT | PARTIAL | 032208-02 MSG! -Msg! Scheduled by IVR. | 8/13/2019 4:35:28 PM
Approved plumbing, electric and mechanical, see notes on frame. . 1. Finish nailing hangars at trusses in garage, 4x4 hangars in master bedroom and bathroom and br #2. 2. Need backing in corner of BR#3. 3. Ufer ground clamp to be accessible (BR#2). 4. Note: Attic access in garage will need to have fire protection. 6. Add clips tp bottom truss chords at valleys. 7. Provide nail plate for vent at bottom plate in middle bathroom.
8/14/2019 7:20:11 AM
Approved plumbing, electric and mechanical, see notes on frame. . 1. Finish nailing hangars at trusses in garage, 4x4 hangars in master bedroom and bathroom and br #2. 2. Need backing in corner of BR#3. 3. Ufer ground clamp to be accessible (BR#2). 4. Note: Attic access in garage will need to have fire protection. 6. Add clips tp bottom truss chords at valleys. 7. Provide nail plate for vent at bottom plate in middle bathroom.
|
|
08/16/2019 | 4-WAY ROUGH FRAME | SCOTT YOUNG | PASS | 032446-01 - Scheduled by IVR. | 8/19/2019 7:42:39 AM
All corrections have been addressed, ok to pass
|
|
08/20/2019 | SHOWER PAN/TUB TEST | ADAM KINGSLEY | PASS | 032501-01 MSG! -Msg! Scheduled by IVR. | |
|
08/30/2019 | UNDERGROUND WATER PI | MIKE KNIGHT | PARTIAL | 033107-01 MSG! -Msg! Scheduled by IVR. | 8/30/2019 2:49:20 PM
Depth of trench approved for electric conduit and water line, however, no test on water line.
9/3/2019 7:47:29 AM
Depth of trench approved for electric conduit and water line, however, no test on water line.
|
|
09/05/2019 | GAS PIPING | WOODY TOWNSEND | PASS | 033333-01 MSG! -Msg! Scheduled by IVR. | 9/6/2019 7:49:46 AM
Underground pipe and test. House test.
|
|
09/05/2019 | UNDERGROUND WATER PI | WOODY TOWNSEND | PASS | | |
|
09/12/2019 | UNDERGROUND PROPANE | MIKE KNIGHT | PASS | 033769-01 - Scheduled by IVR. | |
|
10/10/2019 | ENV HEALTH RELEASE | PAUL THAO | PASS | | |
|
12/20/2019 | **PERMIT FINAL | MIKE KNIGHT | PASS | 037299-01 - Scheduled by IVR. | 12/20/2019 2:48:40 PM
Cal Fire by phone stated this project was approved December 12th. There is minor grading needed to slope away from house in two places which is being done and the portable toilet is being removed.
|
|
12/23/2019 | UNSPECIFIED | MIKE KNIGHT | CANCELLED | | |
|
12/31/2019 | CAL FIRE FINAL INSPE | JOHN GADDIE | PASS | | |
|
01/30/2020 | PW FINAL | PWROADS | PASS | | 1/30/2020 3:05:22 PM
Pass per R-21
|
|