04/07/2021 | FOUNDATION/FOOTINGS | SCOTT YOUNG | FAIL W/RE-INSP FEE | eTRAKiT Inspection Request | 4/6/2021 10:59:12 AM
4/6/2021 10:59 AM sandeep dhami
Contact Name: sandeep dhami
Site Address: 3069 NINTH ST
Phone: 5308441106
e-Mail: ibroker1106@gmail.com
4/8/2021 6:15:06 AM
No one onsite
No plans left onsite.
Not ready for inspection.
4/8/2021 6:16:40 AM
No one onsite
No plans left onsite.
Not ready for inspection.
|
|
04/13/2021 | UNDERFLOOR PLUMBING | ADAM KINGSLEY | PASS | | 4/12/2021 8:06:07 AM
AM PLEASE
4/13/2021 9:44:18 AM
akingsley changed Inspection Type from UNDERFLOOR PLUMBING to UNDER SLAB PLUMBING
|
|
04/13/2021 | FOUNDATION/FOOTINGS | ADAM KINGSLEY | PASS | | 4/12/2021 8:05:55 AM
AM PLEASE
4/13/2021 9:44:23 AM
Setbacks and eufer ground also included.
|
|
04/21/2021 | PRE-SLAB | SCOTT YOUNG | PASS | | |
|
06/09/2021 | SHEARWALL/B.W.P.-EXT | RICHARD PRATT | FAIL | eTRAKiT Inspection Request | 6/8/2021 9:36:13 AM
6/8/2021 9:36 AM sandeep dhami
Contact Name: sandeep dhami
Site Address: 3069 NINTH ST
Phone: 5308441106
e-Mail: ibroker1106@gmail.com
6/9/2021 6:39:01 AM
rpratt changed Inspection Date/Time from 06/09/2021 08:00 AM to 06/09/2021 08:30 AM
6/9/2021 6:39:19 AM
rpratt changed Inspection Date/Time from 06/09/2021 08:00 AM to 06/09/2021 08:30 AM
6/9/2021 11:24:13 AM
1. The Approved Plans Do Not Match the SFD that is built. The SFD built is a combination of 2 sets of plans.
2. Submit the proper plans to the Building Dept for Approval.
3. Call and request all inspections needed, so the proper amount of time can be scheduled. Only shear called in but wanted sheet and shear.
4. Recall inspection when completed.
6/9/2021 11:26:02 AM
1. The Approved Plans Do Not Match the SFD that is built. The SFD built is a combination of 2 sets of plans.
2. Submit the proper plans to the Building Dept for Approval.
3. Call and request all inspections needed, so the proper amount of time can be scheduled. Only shear called in but wanted sheet and shear.
4. Recall inspection when completed.
|
|
07/26/2021 | SHEARWALL/B.W.P.-EXT | RICHARD PRATT | PASS | | 7/26/2021 6:38:08 AM
Rpratt changed Inspection Date/Time from 07/26/2021 08:00 AM to 07/26/2021 11:00 AM
7/26/2021 1:52:15 PM
Shearwall installation - Approved
|
|
07/26/2021 | ROOF FRAME/SHEATHING | RICHARD PRATT | PASS | | 7/26/2021 6:38:16 AM
Rpratt changed Inspection Date/Time from 07/26/2021 08:00 AM to 07/26/2021 11:00 AM
7/26/2021 1:52:24 PM
Truss and roof sheathing- approved
|
|
07/26/2021 | PGE ELECTRIC TAG | RICHARD PRATT | PASS | | 7/26/2021 1:52:58 PM
Electric meter release - Approved
|
|
07/27/2021 | 4-WAY ROUGH FRAME | RICHARD PRATT | FAIL | eTRAKiT Inspection Request | 7/26/2021 12:54:09 PM
7/26/2021 12:54 PM sandeep dhami
Contact Name: sandeep dhami
Site Address: 3069 NINTH ST
Phone: 5308441106
e-Mail: ibroker1106@gmail.com
7/27/2021 6:43:47 AM
rpratt changed Inspection Date/Time from 07/27/2021 08:00 AM to 07/27/2021 10:00 AM
7/28/2021 6:34:34 AM
1. Completely install all windows and exterior cladding.
2. Completely dry-in roof system.
3. Mechanical and electrical trades installed in a building unprotected from the weather with a chance of rain in the forecast.
4. Recall inspection when completed.
|
|
07/28/2021 | 4-WAY ROUGH FRAME | RICHARD PRATT | CANCELLED | eTRAKiT Inspection Request | 7/27/2021 1:45:34 PM
7/27/2021 1:45 PM sandeep dhami
Contact Name: sandeep dhami
Site Address: 3069 NINTH ST
Phone: 5308441106
e-Mail: ibroker1106@gmail.com
7/28/2021 7:00:00 AM
rpratt changed Inspection Date/Time from 07/28/2021 08:00 AM to 07/28/2021 09:30 AM
7/28/2021 8:44:36 AM
Not ready, still hasn't dried the building in.
|
|
08/03/2021 | 4-WAY ROUGH FRAME | RICHARD PRATT | FAIL W/RE-INSP FEE | eTRAKiT Inspection Request | 8/2/2021 2:11:15 PM
8/2/2021 2:11 PM sandeep dhami
Contact Name: sandeep dhami
Site Address: 3069 NINTH ST
Phone: 5308441106
e-Mail: ibroker1106@gmail.com
8/3/2021 7:00:14 AM
rpratt changed Inspection Date/Time from 08/03/2021 08:00 AM to 08/03/2021 11:30 AM
8/3/2021 11:48:02 AM
1. Complete lath installation.
2. Provide the Approved Set Of Plans on-site for the inspection.
3. Pay Re-inspection fee, and recall inspection when completed.
|
|
08/05/2021 | 4-WAY ROUGH FRAME | SCOTT YOUNG | FAIL | eTRAKiT Inspection Request | 8/4/2021 2:59:46 PM
8/4/2021 2:59 PM sandeep dhami
Contact Name: sandeep dhami
Site Address: 3069 NINTH ST
Phone: 5308441106
e-Mail: ibroker1106@gmail.com
8/5/2021 1:31:34 PM
DWV lines not under test
Cannot run romex through conduit,
Fill and recall inspection
|
|
08/06/2021 | 4-WAY ROUGH FRAME | WOODY TOWNSEND | PARTIAL | eTRAKiT Inspection Request | 8/5/2021 2:27:16 PM
8/5/2021 2:27 PM sandeep dhami
Contact Name: sandeep dhami
Site Address: 3069 NINTH ST
Phone: 5308441106
e-Mail: ibroker1106@gmail.com
8/6/2021 7:24:31 PM
1. Wire receptacle in bedroom near door. 2' wall or greater.
2. T brace trusses that only have one truss. A06s and A05.
3. Complete disconnect at attic FAU.
4. Revise energy calcs for all electric heat pump HVAC and water heater.
Corrections can be seen at later inspections.
Okay to proceed with insulation.
|
|
08/06/2021 | UNDERGROUND PLUMBING | WOODY TOWNSEND | PASS | | 8/6/2021 7:26:08 PM
1.5" main from meter to house. Install tracer wire.
|
|
08/06/2021 | STUCCO (LATH) | WOODY TOWNSEND | PASS | | |
|
02/09/2022 | **PERMIT FINAL | ADAM KINGSLEY | CANCELLED | | 2/9/2022 2:53:38 PM
SONIA HAD BROUGHT TO MY ATTENTION YOU STILL NEED CALFIRE SIGN OFF ALONG WITH THE CITY OF BIGGS AND YOUR FINAL WILL NOT PASS TOMORROW AS IS. WE WILL CANCEL UNTIL THOSE TWO INSPECTIONS HAVE BEEN TAKEN CARE OF
THANKS,
ADRIEN PETERSON
|
|
02/10/2022 | **PERMIT FINAL | ADAM KINGSLEY | FAIL | | 2/10/2022 5:14:50 PM
1. Provide City of Biggs & CalFire final clearances.
2. Complete required HERS tests & update energy compliance registry to show project completed.
3. Complete stucco repair/seal around electric service enclosure. -photographic evidence may be provided.
|
|
02/22/2022 | CAL FIRE FINAL INSPE | TROY HAND | PASS | | 2/22/2022 2:56:09 PM
Walked project. All good. Pass
|
|
03/03/2022 | CITY OF BIGGS FINAL | CITY OF BIGGS | PASS | | |
|
02/01/2023 | NPDES | ADAM KINGSLEY | NOT REQUIRED | | |
|
02/01/2023 | **PERMIT FINAL | ADAM KINGSLEY | PASS | | 2/1/2023 11:56:47 AM
PREVIOUS CORRECTIONS COMPLETED. VERFIED VIA PERMIT RECORDS AND PHOTOGRAPHIC EVIDENCE.
|
|