05/16/2019 | 4-WAY ROUGH FRAME | ADAM KINGSLEY | PARTIAL | 028846-01 - Scheduled by IVR. | 5/16/2019 10:50:19 AM
Previous corrections are completed except
LGA 5/14/2019 4:33:30 PM
2) provide attic access, several junction boxes in attic.
6) tankless water heater not installed to code
Ok to proceed, follow up with #2 at next inspection.
Water heater installation not completed. Not part of this permit. Contractor states the owner is installing the WH. Notified a permit is required.
|
|
05/14/2019 | 4-WAY ROUGH FRAME | LARRY AKERS | FAIL | 028710-01 - Scheduled by IVR. | 5/14/2019 4:33:30 PM
1) can not have nm cable run under slab
2) provide attic access, several junction boxes in attic.
3) provide plans and engineering stamped by plan check
4) appears will need special inspection and footing.
5) appears need footings
6) tankless water heater not installed to code
Recall inspection
|
|
02/20/2020 | **PERMIT FINAL | ADAM KINGSLEY | FAIL | 039272-01 - Scheduled by IVR. | 2/20/2020 2:08:27 PM
akingsley changed Inspection Type from 4-WAY ROUGH FRAME to **PERMIT FINAL
2/20/2020 2:30:01 PM
Previous 4way corrections completed.
1. Water heater PTRV discharge to terminate toward ground. Provide 90deg fitting or equal
|
|
02/24/2020 | **PERMIT FINAL | ADAM KINGSLEY | PASS | | |
|