02/28/1850 | NPDES | QUENTIN CARTER | | VOIDED (SLN 12/4/2019) | 12/4/2019 10:08:58 AM
Inspection voided by SLN.
|
|
02/20/2020 | BLOCKING/UNDERPINNIN | WOODY TOWNSEND | PARTIAL | | 2/20/2020 4:33:58 PM
Install perimeter blocking per data sheet under sink.
|
|
02/20/2020 | PERMANENT FOUNDATION | WOODY TOWNSEND | PASS | | 2/20/2020 4:34:59 PM
Provide approved revision for foundation installed.
2/24/2020 8:34:17 AM
Approved revision in inspection jacket. Meets field installation.
|
|
03/05/2020 | BLOCKING/UNDERPINNIN | WOODY TOWNSEND | PASS | am request | |
|
03/05/2020 | UNDERGROUND GAS | WOODY TOWNSEND | PASS | | |
|
04/03/2020 | CAL FIRE FINAL INSPE | CHRIS BOYD | PASS | | 4/3/2020 10:32:57 AM
Ok to final
|
|
06/25/2020 | CONTINUITY TEST | ADAM KINGSLEY | PASS | | |
|
06/25/2020 | SEWER(PIPE/TEST/TAP) | ADAM KINGSLEY | PASS | | 6/25/2020 4:16:00 PM
MH drain test included.
|
|
06/25/2020 | UNDERGROUND WATER PI | ADAM KINGSLEY | PASS | | 6/25/2020 4:16:07 PM
MH to well
|
|
09/27/2022 | ENV HEALTH RELEASE | DARREN JONES | PASS | | 9/27/2022 10:18:51 AM
Floor plan revised for 2 bedroom - existing septic system sized for 2 bedrooms. Water report received - negative for Total / Fecal Coliform.
|
|
| 433A | PERMIT CENTER | PASS | | 9/28/2022 12:31:35 PM
RECEIVED GRANT DEED AND TITLE
|
|
09/29/2022 | **PERMIT FINAL | SCOTT YOUNG | PASS | AM REQUEST | 9/30/2022 6:08:24 AM
See attachments for pictures.
|
|