11/07/2018 | UNDERGROUND CONDUIT | MIKE GENNA | PASS | | |
|
11/07/2018 | UNDERGROUND WATER PI | MIKE GENNA | PASS | | |
|
10/30/2018 | UNDERGROUND CONDUIT | MIKE GENNA | PASS | | |
|
02/28/1850 | NPDES | | | VOIDED (TOM BLIXT 6/26/2018) | |
|
10/17/2018 | FOUNDATION/FOOTINGS | WOODY TOWNSEND | PASS | PLS PHONE GILL W/ETA 530 990 9010 | 10/15/2018 10:13:23 AM
AM if Possible 693-0787
10/17/2018 8:15:25 AM
AM if possible Ryan 693-0787
|
|
01/30/2019 | 4-WAY ROUGH FRAME | SCOTT YOUNG | PASS | AM REQ. 693-0787 | |
|
01/30/2019 | SHEARWALL/B.W.P.-INT | SCOTT YOUNG | PASS | AM REQ. 693-0787 | |
|
11/07/2018 | UNDERGROUND PROPANE | MIKE GENNA | PASS | Inspect propane gas line trench for str | 11/6/2018 6:45:24 AM
11/6/2018 6:45 AM
Contact Name: Ryan
Site Address: 90 QUAIL RIDGE RD
Phone: 5306930787
e-Mail: r_lambert@att.net
|
|
10/23/2018 | PRE-SLAB | ADAM KINGSLEY | PASS | ATTACHED GARAGE | 10/23/2018 12:44:22 PM
Garage
|
|
10/30/2018 | PGE ELECTRIC TAG | MIKE GENNA | PASS | CONST POWER & UNDERGROUND ELEC | 10/30/2018 9:04:55 AM
call owner w results 693-0787
|
|
10/08/2018 | UNDER SLAB PLUMBING | SCOTT YOUNG | PASS | | |
|
12/06/2018 | ROOF NAIL | ADAM KINGSLEY | PASS | | |
|
12/06/2018 | SHEARWALL/B.W.P.-EXT | ADAM KINGSLEY | PARTIAL | | 12/6/2018 8:02:44 AM
Call Ryan 693-0787 for ETA
12/6/2018 5:02:39 PM
Exterior nailing only approved. Hardware not installed. Ok to cover outside. Follow up at next inspection.
|
|
04/16/2019 | GAS TEST | ADAM KINGSLEY | PASS | | 4/17/2019 7:54:14 AM
House test
4/17/2019 7:54:49 AM
House test
|
|
04/16/2019 | TAG LPG | ADAM KINGSLEY | PASS | Card inside panel | 4/17/2019 7:54:12 AM
Tag is at main electric service panel.
4/17/2019 7:54:47 AM
Tag is at main electric service panel.
|
|
05/20/2019 | SHOWER PAN/TUB TEST | SCOTT YOUNG | FAIL | CALL W/ETA | 5/17/2019 8:09:58 AM
CALL OWNER IN AM WITH AN ETA 693-0787 FOR ACCESS
5/20/2019 1:45:04 PM
First bathroom to the left as you come in from garage passed. Second bathroom down the hall between the two bedrooms was dry and did not hold water. Master bath shower, pulled plug and watched, it did not drain at all. Call for reinspection.
|
|
05/21/2019 | SHOWER PAN/TUB TEST | SCOTT YOUNG | PASS | CALL OWNER W/ETA | |
|
06/25/2019 | ENV HEALTH RELEASE | DARREN JONES | PASS | ok to rls 6/25/2019 | |
|
07/11/2019 | CAL FIRE FINAL INSPE | CHRIS BOYD | PASS | | |
|
08/20/2019 | **PERMIT FINAL | MIKE KNIGHT | PARTIAL | | 8/29/2019 8:36:42 AM
Ok to final if bathtub trim is not completed. Address numbers should reflect 82 Quail Ridge.
9/6/2019 4:11:12 PM
1. Address numbers. 2. Finish all electrical (kitchen and dining room, bathroom, laundry room and a few lights. 3. Need anti-siphon 2 hose bibs. 4. Finish master bath tub and kitchen plumbing.
|
|
09/03/2019 | PLANNING CLEARANCE | TRISTAN WEEMS | PASS | CHANGE ADDRESS | 12/12/2018 10:37:14 AM
Will change address per notification from Applicant that construction loan has ended. Address conflict with pre-existing 90 Quail Hill Place.
12/12/2018 1:47:10 PM
Will be 88 Quail Ridge Road.
See APN docs for letter sent to applicant. Email was sent as well.
12/12/2018 3:42:35 PM
OWNER REQUESTED 82 Quail Ridge Road, this conforms to existing range and is acceptable.
12/14/2018 11:21:15 AM
THIS INSPECTION IS TO NOTIFY ASSISTANT PLANNER TRISTAN WEEMS that permit is close to final inspection, 7 days after final inspection Assistant Planner TEW will issue the new address notice for 82 Quail Ridge Road.
4/25/2019 8:01:08 AM
Confirm conversion of loan. Contact ryan 693-0787 or lisa 693-0786
9/3/2019 2:07:52 PM
ISSUED CHANGE OF ADDRESS TO 82 QUAIL RIDGE ROAD.
|
|
09/06/2019 | **PERMIT FINAL | MIKE KNIGHT | PASS | | |
|