| ENV HEALTH RELEASE | DARREN JONES | | | 10/20/2017 3:53:47 PM
Pending septic final for release.
|
|
| NPDES | | | chapter 50 area | |
|
07/20/2018 | GAS TEST | MIKE GENNA | PASS | | 7/20/2018 3:55:08 PM
house and yard
|
|
05/22/2018 | SHOWER PAN/TUB TEST | MIKE GENNA | PASS | | 5/22/2018 3:18:00 PM
X2
|
|
02/08/2018 | 4-WAY ROUGH FRAME | LARRY AKERS | FAIL | REQ AM | 2/8/2018 4:24:56 PM
See past corrections, fan still not vented to outside.
|
|
01/22/2019 | **PERMIT FINAL | WOODY TOWNSEND | PASS | | |
|
10/30/2017 | PRE-SLAB | SCOTT YOUNG | PASS | | |
|
11/28/2017 | ROOF NAIL | ADAM KINGSLEY | PASS | | |
|
11/28/2017 | SHEARWALL/B.W.P.-EXT | ADAM KINGSLEY | PARTIAL | | 11/28/2017 4:45:35 PM
Exterior straps and nailing only, approved. Ok to cover. Follow up with remaining at 4-way inspection.
|
|
01/10/2018 | PGE ELECTRIC TAG | ADAM KINGSLEY | FAIL | | 1/9/2018 3:00:22 PM
CALL STEVE S WITH ETA 40 MIN PRIOR TO ARRIVAL // 570-6400
1/10/2018 12:59:33 PM
1. Panel not grounded. GEC not installed/connected to eufer ground.
2. Temp power circuit and 20A GFCI protected receptacle not installed.
|
|
01/16/2018 | PGE ELECTRIC TAG | MIKE GENNA | PASS | | 1/11/2018 2:56:24 PM
CALL STEVE S 40 MIN PRIOR TO ARRIVAL 570-6400
|
|
02/02/2018 | 4-WAY ROUGH FRAME | LARRY AKERS | FAIL | PM REQUEST // STEVE 570-6400 | 2/1/2018 9:06:56 AM
CALL STEVE S 20 MIN PRIOR TO ARRIVAL
2/2/2018 12:59:12 PM
1) need vent install bath fan front right bath room.
2) need exterior or interior attic access
|
|
07/31/2018 | PUBLIC WKS CLEARANCE | RICK FURMANSKI | PASS | | 7/25/2018 1:19:31 PM
SEE PW17-0055
|
|
03/02/2018 | STUCCO (LATH) | MIKE GENNA | PASS | | 3/1/2018 11:04:12 AM
CALL STEVE 30 MIN PRIOR TO ARRIVAL
570-6400
|
|
03/02/2018 | GAS TEST | MIKE GENNA | PASS | | 3/1/2018 11:03:56 AM
CALL STEVE 30 MIN PRIOR TO ARRIVAL
570-6400
|
|
12/06/2018 | **PERMIT FINAL | LARRY AKERS | FAIL | | 12/6/2018 12:09:21 PM
1) need house numbers
2) exterior receptacles need to be weather resistant
3) need drop down ladder installed in garage
4) need fire and county health sign off
5) need all paper work and forms
|
|
10/23/2017 | FOUNDATION/FOOTINGS | ADAM KINGSLEY | PASS | | 10/23/2017 3:47:05 PM
Setbacks eufer ground and pier footings approved
|
|
| IMPACT FEES DUE | DSINSPECTION | | | |
|