12/19/2018 | SHEARWALL/B.W.P. | ADAM KINGSLEY | PARTIAL | | 12/19/2018 12:36:21 PM
Received EOR letter for previous correction. Electric panel cut into SW. blocking not installed.
|
|
| NPDES | | | Chapter 50 area | |
|
02/28/2018 | FOUNDATION/FOOTINGS | MIKE GENNA | PASS | 017318-01 - Scheduled by IVR. | |
|
12/26/2018 | ROOF NAIL | WOODY TOWNSEND | PASS | 024943-01 - Scheduled by IVR. | 12/26/2018 4:55:29 PM
Roof nail okay to cover.
Provide engineers revision omitting DSC2 hardware from drag trusses.
|
|
12/19/2018 | ROOF NAIL | ADAM KINGSLEY | PARTIAL | | 12/19/2018 12:36:26 PM
East facing roof plane over patio and transitions, CA framing over North wall not completed (including two drag truss). Ok to cover completed areas. Incomplete work to remain exposed for inspection.
|
|
03/29/2019 | 4-WAY ROUGH FRAME | LARRY AKERS | FAIL | 027368-01 MSG! -Msg! Scheduled by IVR. | 3/29/2019 12:01:20 PM
1) draft stop at garagel and several places throughout house
2) need detail 3/s1 and 2/s1 completed.
3) call in fire sprinkler permit
|
|
04/02/2019 | 4-WAY ROUGH FRAME | LARRY AKERS | PASS | 027457-01 MSG! -Msg! Scheduled by IVR. | |
|
04/02/2019 | FIRE SPRINKLERS | LARRY AKERS | PASS | 027457-02 - Scheduled by IVR. | 4/2/2019 1:02:55 PM
Rough plumbing approved
|
|
10/16/2018 | UNDERFLOOR FRAMING | LARRY AKERS | PASS | | |
|
12/06/2018 | SHEARWALL/B.W.P.-EXT | LARRY AKERS | PARTIAL | | 12/6/2018 2:12:16 PM
Need letter from engineer for main electrical panel in shear wall. Ok to cover less any correction at main.
|
|
03/01/2019 | STUCCO (LATH) | LARRY AKERS | PASS | | 2/28/2019 12:59:45 PM
PM REQUESTED MARK 520.6942
|
|
10/08/2018 | FOUNDATION/FOOTINGS | ADAM KINGSLEY | PASS | MARK 530 520 6942 | 10/8/2018 2:09:11 PM
Exterior pier/continuous (porch's) approved
|
|
10/16/2018 | ROUGH PLUMBING | LARRY AKERS | PASS | MARK 520-6942 | 10/16/2018 3:25:15 PM
Under floor plumbing approved
|
|
09/18/2019 | SHOWER PAN/TUB TEST | ADAM KINGSLEY | PASS | 033969-02 - Scheduled by IVR. | 9/18/2019 2:05:25 PM
2x pans
|
|
09/18/2019 | GAS TEST | ADAM KINGSLEY | PASS | 033969-01 - Scheduled by IVR. | 9/18/2019 2:05:36 PM
House test
Tag issued.
|
|
10/29/2019 | ENV HEALTH RELEASE | DARREN JONES | PASS | | 10/29/2019 9:21:40 AM
Septic system finaled. Pass
|
|
10/30/2019 | **PERMIT FINAL | PHILLIP MYERS | FAIL | 035574-01 MSG! -Msg! Scheduled by IVR. | |
|
10/31/2019 | CAL FIRE FINAL INSPE | JOHN GADDIE | PASS | | |
|
| PUBLIC WKS CLEARANCE | BILLY THOMAS | PASS | | 12/3/2019 2:39:16 PM
Pass Per R-21
|
|
12/04/2019 | **PERMIT FINAL | PHILLIP MYERS | PASS | | |
|