05/06/2025 | PIER/COLUMN FOOTINGS | WOODY TOWNSEND | PASS | 078319-01 - Scheduled by IVR. | 5/6/2025 3:49:02 PM
Setbacks and footings approved
|
|
05/12/2025 | UNDERGROUND ELECTRIC | RANDALL SMITH | FAIL | 078414-01 - Scheduled by IVR. | 5/12/2025 5:01:22 PM
1. Provide sand or clean fill for a minimum of 12 inches over the conduit or equal. CEC 300.5(F)
2. Call for reinspection when corrections are completed.
|
|
05/13/2025 | UNDERGROUND CONDUIT | WOODY TOWNSEND | PASS | | 5/13/2025 8:34:10 AM
Approved sch 80 conduit to be backfilled with native soil. Back fill had minimal large angular rocks.
|
|
| **PERMIT FINAL | SCOTT YOUNG | | 078431-01 - Scheduled by IVR. | |
|