02/29/2024 | FIRE MARSHAL CLEARAN | CHRIS BOYD | VOID | VOIDED (CCB2 2/29/2024) | 2/29/2024 3:10:08 PM
Fire inspection is not required and ok to refund fees
2/29/2024 3:10:16 PM
Inspection voided by CCB2.
|
|
04/28/2025 | UNDER SLAB PLUMBING | SCOTT YOUNG | PASS | 078169-01 - Scheduled by IVR. | 4/29/2025 6:12:14 AM
Underslab plumbing and electrical (partial , only bathroom area looked at , septic tank not installed.)
|
|
04/30/2025 | FOUNDATION/FOOTINGS | CHRISTOPHER ROBERTS | PASS | 078235-01 MSG! -Msg! Scheduled by IVR. | 4/30/2025 12:58:35 PM
Foundation/footings - Approved
|
|
04/30/2025 | UNDERGROUND ELECTRIC | CHRISTOPHER ROBERTS | PASS | | 4/30/2025 12:58:42 PM
Underground electric - Approved
|
|
05/12/2025 | PIER/COLUMN FOOTINGS | SCOTT YOUNG | PASS | 078394-01 - Scheduled by IVR. | 5/12/2025 6:13:47 AM
Pier column footings-Approved
Light pole footings and small curb between scale and bldg.- Approved
|
|
05/13/2025 | ROOF NAIL | WOODY TOWNSEND | PASS | 078475-01 MSG! -Msg! Scheduled by IVR. | |
|
05/21/2025 | 4-WAY ROUGH FRAME | WOODY TOWNSEND | PASS | 078596-01 - Scheduled by IVR. | |
|
05/13/2025 | SHEARWALL/B.W.P.-EXT | WOODY TOWNSEND | PASS | | 5/13/2025 4:01:09 PM
Provide SI report for epoxied anchors and install HD and DTZ hardware.
Exterior nail okay to cover.
5/28/2025 4:27:19 PM
SI report received and hardware installed.
|
|
05/29/2025 | SHEARWALL/B.W.P.-INT | WOODY TOWNSEND | CANCELLED | | |
|
07/09/2025 | FIRE MARSHAL CLEARAN | CHRIS BOYD | PASS | | 7/9/2025 1:10:34 PM
Ok to final.
|
|
07/09/2025 | **PERMIT FINAL | RANDALL SMITH | FAIL | 079283-01 MSG! -Msg! Scheduled by IVR. | 7/9/2025 2:50:19 PM
1. Provide a maximum 15 amp breaker for the mini split or equal.
2. Provide a RFI for booster pump and listing showing maximum breaker size.
3. Label all electrical outlets.
4. Provide a working water heater.
5. Provide screen guards in the gutters or equal.
6. Provide final approval from Butte County Environmental Health.
7. Provide fina approval from Butte County Public Works NPDES.
8. Provide final approval from Cal Fire.
9. Provide required certificates of acceptance: NCRA-ENV-02-A, NCRA-LTI-02-A, NCRA-MCH-02-A, NCRA-MCH-03-A.
10. Provide all required special inspection reports.
11. Call for reinspection when corrections are completed.
Surveillance equipment is not installed at this time. Contractor states this is a responsibility of the county not the contractor..
Scott@slaterandson.com
|
|
07/10/2025 | ENV HEALTH RELEASE | KATTY HERNANDEZ | PASS | See Notes | 4/3/2024 2:00:02 PM
PENDING SEPTIC, EHS22-0322, FINAL APPROVAL.
7/10/2025 8:25:41 AM
Septic Tank has been finaled.
|
|
07/15/2025 | **PERMIT FINAL | RANDALL SMITH | PASS | 079373-01 - Scheduled by IVR. | 7/15/2025 5:04:40 PM
All previous corrections were completed
|
|
07/17/2025 | LAND DEV FINAL | PWLANDDEV | PASS | | |
|