09/16/2024
12:48 PM

Butte County
Department of Development Services

Main: 530.552.3700
Automated Inspection Phone Line: 530.538.4365
Online Inspection Scheduling / Payments / Renewals:
ButteCounty.net/DDS

 
Permit No. B23-2107 Permit Type   MISCELLANEOUS Site Address   2068 TEHAMA AVE
OROVILLE, CA 95965
Applied   06/29/2023 Applicant   SCOTT, RONNY
Approved   08/31/2023 Owner   SCOTT RONNY & TANYA
Issued   09/01/2023 Contractor   O/B - SCOTT, RONNY
Parent Permit No.   Description   RES BEDRM ADDN(200) REMDL(436) REAR COVD(705)
  Notes  
 
  Date of Inspection Inspection Type Inspector Result Remarks Notes

 09/05/2023FOUNDATION/FOOTINGSWOODY TOWNSENDCANCELLED

 12/14/2023UNDER SLAB PLUMBINGRICHARD PRATTFAIL070301-01 - Scheduled by IVR.12/14/2023 5:22:26 AM rpratt changed Inspection Date/Time from 12/14/2023 08:00 AM to 12/14/2023 2:30 PM 12/14/2023 5:25:29 AM rpratt changed Inspection Date/Time from 12/14/2023 02:30 PM to 12/14/2023 10:00 AM 12/14/2023 6:48:30 PM Provide a 10' head of water for the test. Provide a sleeve that encompasses the DWV line that goes through the footings. Recall inspection when completed.

 12/14/2023UNDER SLAB PLUMBINGRICHARD PRATTPASS12/14/2023 6:48:41 PM All correction items completed Inspection- Approved

 01/02/2024FOUNDATION/FOOTINGSCHRISTOPHER ROBERTSPASS070573-01 - Scheduled by IVR.1/2/2024 2:51:23 PM Foundation/footings - Approved

 01/02/2024PIER/COLUMN FOOTINGSCHRISTOPHER ROBERTSPASS070573-02 - Scheduled by IVR.1/5/2024 7:17:14 AM Pier/column footings - Approved

 01/09/2024PRE-SLABRANDALL SMITHPASS070702-05 - Scheduled by IVR.1/9/2024 8:38:48 AM rjsmith changed Inspection Type from UFER GROUND to PRE-SLAB 1/9/2024 5:33:55 PM Ok to pour

 02/23/2024TRUSSES FLOOR/ROOFCHRISTOPHER ROBERTSNOT REQUIRED071373-08 - Scheduled by IVR.

 02/23/2024TRUSS ROOFCHRISTOPHER ROBERTSPARTIAL071373-07 - Scheduled by IVR.2/23/2024 2:21:57 PM 1. Change in truss layout for 8 - A11 trusses at front of building. Changes do not match truss calcs on file. Submit new layout and calcs to Building Dept. for plan check. 2. Provide H1 straps or equal to 4x12 beams at front door per plans. ** can inspect if approved at 4-way

 02/23/2024SHEARWALL/B.W.P.-INTCHRISTOPHER ROBERTSFAIL071373-06 - Scheduled by IVR.2/23/2024 2:22:05 PM 1. Shearwall int anchor bolts (titans) require 3x3 square washers on anchor bolts. 2. Replace bottom sill plate that is rotted out in rear bedroom NE corner. Add anchor bolts to that section.

 02/23/2024SHEARWALL/B.W.P.-EXTCHRISTOPHER ROBERTSPASS071373-05 - Scheduled by IVR.2/23/2024 2:22:11 PM Shearwall ext. - Approved Okay to wrap

 02/23/2024SHEAR TRANSFERCHRISTOPHER ROBERTSPASS071373-04 - Scheduled by IVR.2/23/2024 2:22:17 PM Shear transfer - Approved

 02/23/2024ROOF PRE-INSPECTIONCHRISTOPHER ROBERTSNOT REQUIRED071373-03 - Scheduled by IVR.

 02/23/2024ROOF NAILCHRISTOPHER ROBERTSPARTIAL071373-02 - Scheduled by IVR.2/23/2024 2:22:33 PM Roof nail - Approved ** new truss layout required stamped and approved through county. ** inspect at 4-way ** okay to cover

 02/23/2024ROOF FRAME/SHEATHINGCHRISTOPHER ROBERTSPASS071373-01 - Scheduled by IVR.2/23/2024 2:22:40 PM Roof frame sheathing - Approved

 03/27/2024STUCCO (LATH)RANDALL SMITHFAIL3/27/2024 2:47:56 PM 1. Lath is not completed around the old main electrical panel. Call for inspection when panel has been removed and lath has been completed. Ok to apply scratch coat to the rest of the house.

 06/20/20244-WAY ROUGH FRAMESCOTT YOUNGFAIL073232-01 - Scheduled by IVR.6/21/2024 6:18:10 AM 1. Tie all grounds together 2. Use green grounding screw in all metal boxes 3. Have DWV under test 4. Cover all registers and return air vents. 5. Remove and secure all Romex from truss gang nails. 6. Remove Romex from conduit to kitchen island and replace with either THHN or THWN. 7. Straps required at 4x12 at coffered entry way( splice). 8.fir out back bedroom wall and add Sheetrock backing at floor level. 9. Secure electrical wiring coming into sub panel in walk in closet. 10. Vent all exhaust fans to exterior. 11. Have kitchen vent hood installed and vented to exterior.

 06/24/20244-WAY ROUGH FRAMECHRISTOPHER ROBERTSFAIL073343-01 - Scheduled by IVR.6/24/2024 10:08:39 AM 1. HVAC unit in attic requires seismic strapping as unit is sitting on platform and not secured. 2. Provide ground screw for metal gang box for stove. 3. Secure all romex in attic and protect romex up to 6' of the attic hatch. 4. Provide nail plate protection for ABS water lines in guest bathroom. 5. Seal off hole behind guest bathroom bathtub and add insulation. 6. Provide a strap for break in bottom sill plate behind bathtub and in bathroom. 7. Backflow preventers needed on all outdoor spigots. 8. Provide a strap for break in bottom plate in main bathroom for ABS line. Tighten anchor next to break. 9. Provide plumbing under test for inspection. 10. Submit new truss calcs to Butte County for plan check. **All prior corrections have been completed. Complete work and call for re-inspection.

ENV HEALTH RELEASEBC Land UseNOT REQUIRED

 07/08/20244-WAY ROUGH FRAMEWOODY TOWNSENDFAIL073563-01 - Scheduled by IVR.7/8/2024 4:39:14 PM Test all new ABS plumbing for rough top out. All other corrections completed.

 07/10/20244-WAY ROUGH FRAMEWOODY TOWNSENDPASS073620-01 - Scheduled by IVR.7/10/2024 4:23:33 PM Top out plumbing test approved.

 07/22/2024PGE ELECTRIC TAGWOODY TOWNSENDPARTIAL073788-01 - Scheduled by IVR.7/22/2024 4:07:15 PM Install surge protection prior to final.

 07/26/2024SERVICE PANELCHRISTOPHER ROBERTSCANCELLED073827-01 - Scheduled by IVR.7/26/2024 8:45:30 AM croberts changed Inspection Date/Time from 07/26/2024 01:00 PM to 07/26/2024 1:30 PM 7/26/2024 9:22:01 AM croberts changed Inspection Date/Time from 07/26/2024 01:30 PM to 07/26/2024 1:00 PM 7/26/2024 3:18:02 PM Not needed. Partial and tag given for service panel. Correction requires surge protector by permit final.