| CAL FIRE FINAL INSPE | CHRIS BOYD | | | |
|
| ENV HEALTH RELEASE | KATTY HERNANDEZ | | HOLD FOR WATER LAB REPORT | 6/12/2023 12:05:20 PM
PENDING VERIFICATION OF POTABLE WATER.
8/9/2023 2:32:27 PM
RECEIVED COLIFORM BACTERIA REPORT. PENDING NITRATE REPORT.
|
|
11/21/2023 | UNDER SLAB PLUMBING | WOODY TOWNSEND | PASS | 070036-01 - Scheduled by IVR. | |
|
11/21/2023 | SETBACKS | WOODY TOWNSEND | PASS | | |
|
12/14/2023 | FOUNDATION/FOOTINGS | ADAM KINGSLEY | FAIL | 070330-01 - Scheduled by IVR. | 12/14/2023 3:37:55 PM
1. Clear loose grave from footings and above plastic vapor barrier.
2. Provide corner ties at continuous top and bottom reinforcement to ensure a minimum 24" lap for splice.
3. Missing SB 5/8 x 24 anchors at front facing wall. Install or equal per S2.1.
4. Missing SSB16 anchors at rear facing wall. Install per S2.1 or equal.
5. Provide minimum 3" clearance for steel reinforcement to earth at rebar support stakes, SSTB's, Optional rebar slab ties.
6. Unable to verify footing depth 12" below undisturbed soil at North and West facing walls due to gravel fill. Appears to be too shallow.
Note: no eufer ground present.
|
|
12/19/2023 | FOUNDATION/FOOTINGS | CHRISTOPHER ROBERTS | PASS | 070414-01 - Scheduled by IVR. | 12/19/2023 3:56:36 PM
Foundation/footings - Approved
|
|
04/04/2024 | ROOF NAIL | RANDALL SMITH | FAIL | 071931-02 - Scheduled by IVR. | 4/4/2024 4:15:02 PM
1. Cover roof to allow roof nail inspection or provide a letter of approval from the Engineer of record.
4/4/2024 4:32:56 PM
1. Cover roof to allow roof nail inspection or provide a letter of approval from the Engineer of record.
|
|
04/04/2024 | 4-WAY ROUGH FRAME | RANDALL SMITH | FAIL | 071931-01 - Scheduled by IVR. | 4/4/2024 4:15:10 PM
Before a 4 way inspection can be completed, schedule an exterior shear-wall inspection and a roof frame and sheathing inspection.
4/4/2024 4:33:03 PM
Before a 4 way inspection can be completed, schedule an exterior shear-wall inspection and a roof frame and sheathing inspection.
|
|
04/18/2024 | ROOF PRE-INSPECTION | WOODY TOWNSEND | FAIL | 072251-01 - Scheduled by IVR. | 4/18/2024 12:36:41 PM
1. Edge nail roof sheathing to freeze blocks.
2. Add 2 rows 4" o.c. At shear transfer to front drag truss connection detail S/5.3.
3. Nail truss scabs at 8" o.c.
4. Frame soffit and install wui compliant ventilation and soffit.
5. Nail roof sheathing 6/12 and add nails at over driven areas.
|
|
04/18/2024 | SHEARWALL/B.W.P.-EXT | WOODY TOWNSEND | FAIL | | 4/18/2024 12:36:48 PM
1. Install 3x3" square washers at anchor bolts and install anchors within 12" of plate breaks.
2. Nail shear walls per schedule. See D walls at 3". Add nails throughout add overdriven.
3. Frame shear wall at bedroom 1. Floor plan and shear conflict.
|
|
04/23/2024 | ROOF PRE-INSPECTION | RANDALL SMITH | CANCELLED | 072313-01 - Scheduled by IVR. | |
|
04/23/2024 | ROOF FRAME/SHEATHING | RANDALL SMITH | PASS | | 4/23/2024 3:19:59 PM
Passed ok to cover
|
|
04/23/2024 | SHEARWALL/B.W.P.-EXT | RANDALL SMITH | FAIL | | 4/23/2024 3:20:07 PM
1. Provide a pull test for all epoxied anchor bolts or provide a letter from the engineer of record approving epoxied anchor bolt installation.
Ok to dry in.
|
|
04/04/2024 | SHEARWALL/B.W.P.-EXT | RANDALL SMITH | FAIL | | 4/24/2024 7:59:26 AM
1. Install HDU 5’s at the front of the house as per approved plans. Install all hdu screws.
2. Install HDU 2’s at the rear of the house as per approved set of plans .
3. Un cover all shear walls to allow nailing inspection as per approved set of plans.
4. Install all A35 clips as per approved set of plans page S1 shear wall schedule.
5. Provide 3 by 3 washers on all anchor bolts.
6. Remove all shiners and replace with nail.
7. Call for reinspection when corrections are all completed.
|
|
| 4-WAY ROUGH FRAME | RANDALL SMITH | | 079013-01 - Scheduled by IVR. | |
|