Permit No. B22-2556 Permit Type   NRES NON RESIDENTIAL Site Address   11181 MIDWAY
CHICO, CA 95928
Applied   08/05/2022 Applicant   GP DEVELOPMENT CORP.
Approved   03/16/2023 Owner   JOHN WU
Issued   03/16/2023 Contractor   GP DEVELOPMENT CORP.
Parent Permit No.   Description   VET EXPANSION (1704) INTERIOR TI (PAINT + CARPET)
  Notes  
 
  Date of Inspection Inspection Type Inspector Result Remarks Notes

 09/14/2023SETBACKSRICHARD PRATTPASS9/14/2023 1:59:23 PM Setbacks checked and Approved

 09/14/2023FOUNDATION/FOOTINGSRICHARD PRATTPASS068833-01 - Scheduled by IVR.9/14/2023 5:41:24 AM rpratt changed Inspection Date/Time from 09/14/2023 08:00 AM to 09/14/2023 11:00 AM 9/14/2023 1:59:28 PM Forms and footings - Approved

 09/14/2023FORMS/STEEL/HOLDOWNSRICHARD PRATTPARTIAL068833-02 - Scheduled by IVR.9/14/2023 5:41:21 AM rpratt changed Inspection Date/Time from 09/14/2023 08:00 AM to 09/14/2023 11:00 AM 9/18/2023 6:38:28 AM Provide an Engineered Solution to the lack of a spread footing for the load above from the 2nd floor to the Building Dept. Engineer. Project Engineer suggested a 40"x40"x12" footing with (4) #5's e.w. Contractor went with 42"x42x13" and (4) #5's e.w. See photo. Pour at own risk.rpratt changed Inspection Date/Time from 09/14/2023 11:00 AM to 09/14/2023 2:30 PM

 09/22/2023UNDERFLOOR FRAMINGRICHARD PRATTPASS069023-01 - Scheduled by IVR.9/22/2023 7:03:07 AM rpratt changed Inspection Date/Time from 09/22/2023 08:00 AM to 09/22/2023 09:30 AM 9/22/2023 11:42:46 AM Underfloor framing at new office and new wing. - Approved

 09/22/2023UNDERFLOOR PLUMBINGRICHARD PRATTPASS9/22/2023 11:42:49 AM Underfloor plumbing in the new wing - Approved

 09/22/2023UNDERGROUND PLUMBINGRICHARD PRATTPASS9/22/2023 11:42:53 AM Underground plumbing in new break room - Approved

 09/26/2023FLOOR NAILRICHARD PRATTPASS069065-01 - Scheduled by IVR.9/26/2023 12:53:51 PM Floor diaphragm installation and nailing - Approved

 10/05/2023ROOF NAILWOODY TOWNSENDPARTIAL069233-02 - Scheduled by IVR.10/5/2023 1:15:11 PM Provide engineers approval to omit details s3/9 2x6 bracing when using I joist and adding full depth blocking clarifying all connections. Okay to cover roof nail excluding west addition.

 10/05/2023SHEARWALL/B.W.P.-EXTWOODY TOWNSENDPARTIAL069233-01 - Scheduled by IVR.10/5/2023 1:15:17 PM wtownsend changed Inspection Type from SHEARWALL/B.W.P.-INT to SHEARWALL/B.W.P.-EXT 10/5/2023 3:27:30 PM Shear approved excluding west side addition. 10/5/2023 3:27:48 PM Shear approved excluding west side addition.

 10/26/2023ROUGH FRAMELARRY AKERSPARTIAL069647-01 - Scheduled by IVR.10/26/2023 10:04:15 AM Under floor frame at west rear approved.

 11/14/2023ROOF NAILCHRISTOPHER ROBERTSPASS069935-02 - Scheduled by IVR.11/14/2023 7:52:29 AM croberts changed Inspection Date/Time from 11/14/2023 12:30 PM to 11/14/2023 12:00 PM 11/14/2023 11:51:28 AM Roof nail west addition - Approved

 11/14/2023SHEARWALL/B.W.P.-EXTCHRISTOPHER ROBERTSPASS069935-01 - Scheduled by IVR.11/14/2023 7:52:36 AM croberts changed Inspection Date/Time from 11/14/2023 12:30 PM to 11/14/2023 12:00 PM 11/14/2023 11:51:35 AM Shearwall ext. west side - Approved

 12/04/20234-WAY ROUGH FRAMERICHARD PRATTCANCELLEDCancelled on 12/4/2023 at 12:47 PM

 12/06/20234-WAY ROUGH FRAMELARRY AKERSFAIL070208-02 - Scheduled by IVR.12/6/2023 10:31:21 AM 1) draft stop wall to cealing

 12/06/2023STUCCO (LATH)LARRY AKERSPASS070196-01 - Scheduled by IVR.

 12/07/20234-WAY ROUGH FRAMELARRY AKERSPASS070247-01 - Scheduled by IVR.

 10/07/2024TAG ELECTRICRICHARD PRATTFAIL075049-02 - Scheduled by IVR.10/7/2024 6:42:17 AM rpratt changed Inspection Date/Time from 10/07/2024 08:00 AM to 10/07/2024 3:30 PM 10/8/2024 8:23:54 PM Provide a 2nd ground rod a minimum of 6' away from the 1st or equal. Provide someone on-site to perform the torque test. Inspection stopped at that point.

 10/07/2024SERVICE PANELRICHARD PRATTCANCELLED075049-01 - Scheduled by IVR.10/7/2024 6:42:24 AM rpratt changed Inspection Date/Time from 10/07/2024 08:00 AM to 10/07/2024 3:30 PM

 10/09/2024PGE ELECTRIC TAGWOODY TOWNSENDPASS075118-01 - Scheduled by IVR.10/9/2024 4:42:11 PM wtownsend changed Inspection Type from SERVICE PANEL to PGE ELECTRIC TAG 10/9/2024 4:59:43 PM 1000 amp main service connection authorized. 2nd ground rod to be disconnected from existing service and connected to new service prior to utility connection. Complete all circuits, label and bond gas and water pipes to new service.

 02/11/2025**PERMIT FINALWOODY TOWNSENDFAIL077038-01 - Scheduled by IVR.2/11/2025 4:48:26 PM 1. Obtain department final approvals for NPDES, Land Development, Health And Fire Marshall. 2. Submit revisions for mechanical and electrical changes for approval. Mechanical units are all mini splits with no ducted unit and sub panel identifications and locations have changed. Reinspect mechanical and electrical panels after plan revisions are approved. Wiring in panels have been inspected. 3. Obtain permit for ev charging stations. 4. Post AIC rating from PGE on ARC Flash Warning at main service. 5. Bond metal gas and water pipes. 6. Provide ladder for roof inspection. 7. Provide accessible route to safe dispersal area from all exits. 8. Clear and level safe dispersal area. 9. Stripe exterior stair treads install hand rails and guide curb per AO.4/2&3. 10. Install all illuminated and tactile exit signs per plan. 11. Provide all electrical and mechanical final energy compliance installation and acceptance forms per revised mechanical plan.

NPDESPWLANDDEVVOIDED (KH1 2/12/2025)2/12/2025 11:06:47 AM Inspection voided by KH1. Most recent remarks follow: During Construction

 02/13/2025NPDESPWLANDDEVPASSFinal Inpsection

 02/13/2025LAND DEV FINALPWLANDDEVPASS

 02/25/2025ENV HEALTH RELEASEPAUL THAOPARTIALPending septic final for release8/11/2022 7:46:16 PM Reassigned P Thao 8/11/22 2/25/2025 8:33:26 AM Proposed designer septic system was not installed. A second septic system was connected for use. Pending a certified designer's assessment of the septic system location and sizing for approval.

 04/01/2025FIRE MARSHAL CLEARANCHRIS BOYDPASS4/1/2025 1:18:20 PM Ok to final, address is posted.

**PERMIT FINALDSINSPECTIONVOIDED (CRW 7/8/2025)

 07/10/2025**PERMIT FINALRANDALL SMITHFAIL079353-02 - Scheduled by IVR.7/10/2025 5:23:52 PM 1. Provide final approval from Butte County Environmental Health. 2. Provide a maximum 15 amp breaker or equal for mini split unit d. 3. Provide a maximum 15 amp breaker for unit c. 4. Secure all mini split units in 2 locations. 5.Label 20 amp breaker in sub panel 3 row 26. 6. Provide maximum 15 amp breakers in mini split units A&B. 7. Hand rail at the exterior of the staff lounge is loose. Repair, replace or equal. 8. Provide all electrical, indoor lighting and mechanical final energy compliance installation and acceptance forms. 9. Provide listing data showing installed 60 amp breakers are required for the ev chargers or provide 40 amp breakers for the ev chargers as per revised set of plans or equal. 10. Call for reinspection when corrections are completed. Bkennedy@gpdevelopmentcorp.com

 07/15/2025**PERMIT FINALSCOTT YOUNGPARTIAL079433-01 - Scheduled by IVR.7/14/2025 10:09:33 AM ENERGY COMPLIANCE ATTACHED TO PERMIT 7/16/2025 7:46:23 AM All previous corrections have been completed. Final pending Environmental health sign off. 7/16/2025 7:47:27 AM All previous corrections have been completed. Final pending Environmental health sign off. 7/16/2025 7:48:19 AM All previous corrections have been completed. Final pending Environmental health sign off. 7/16/2025 7:49:36 AM All previous corrections have been completed. Final pending Environmental health sign off. 7/16/2025 7:50:34 AM All previous corrections have been completed. Final pending Environmental health sign off.