08/10/2022 | FORMS/STEEL/HOLDOWNS | RANDALL SMITH | PASS | PM REQUEST | 8/10/2022 5:04:09 PM
1. Provide an approved set of plans on site for next inspection.
Note under ground plumbing was not under test. Verified location of plumbing as per plans.
|
|
08/10/2022 | SETBACKS | RANDALL SMITH | PASS | | 8/10/2022 5:04:30 PM
Verified setbacks
|
|
08/10/2022 | FOUNDATION/FOOTINGS | RANDALL SMITH | PARTIAL | | 8/10/2022 5:04:38 PM
1. Provide an approved set of plans on site for next inspection.
Ok to pour.
Note under ground plumbing was not under test. Verified location of plumbing as per plans.
|
|
08/22/2022 | PRE-SLAB | RICHARD PRATT | PASS | AM REQUEST | 8/18/2022 3:23:15 PM
EARLY AM
8/21/2022 12:40:01 PM
CANCELLED BY INSPECTOR, PERMIT HAS NOT BEEN ISSUED AT PRESENT.
8/22/2022 6:05:18 PM
Pre pour slab - Approved
|
|
08/22/2022 | UNDER SLAB PLUMBING | RICHARD PRATT | PASS | | 8/22/2022 6:06:21 PM
Underslab plumbing tests - Approved
|
|
10/05/2022 | ROOF NAIL | WOODY TOWNSEND | PASS | | |
|
10/05/2022 | SHEARWALL/B.W.P.-EXT | WOODY TOWNSEND | PARTIAL | 062613-01 MSG! -Msg! Scheduled by IVR. | 10/5/2022 4:25:54 PM
Add cs16 straps at BX shear wall per elevation notes.
All that's pending exterior cover.
|
|
11/10/2022 | 4-WAY ROUGH FRAME | WOODY TOWNSEND | PARTIAL | 063422-01 MSG! -Msg! Scheduled by IVR. | 11/10/2022 1:46:11 PM
Shear and 4-way approved for detached garage/shop/bath.
Underground water approved.
Underground feeder to sub not installed. Can be seen later.
|
|
11/30/2022 | FORMS/STEEL/HOLDOWNS | SCOTT YOUNG | PASS | AM REQUEST | 12/1/2022 5:52:55 AM
Approved
See attachments for pictures
|
|
02/16/2023 | PRE-SLAB | RICHARD PRATT | PASS | 065214-01 MSG! -Msg! Scheduled by IVR. | 2/16/2023 5:21:40 AM
rpratt changed Inspection Type from UNDERFLOOR FRAMING to PRE-SLAB
2/16/2023 5:51:54 AM
rpratt changed Inspection Date/Time from 02/16/2023 08:00 AM to 02/16/2023 1:30 PM
2/16/2023 4:36:25 PM
Pre pour slab - Approved
|
|
05/02/2023 | SHEARWALL/B.W.P.-EXT | WOODY TOWNSEND | PASS | | 5/2/2023 4:13:37 PM
Dwelling addition.
|
|
05/02/2023 | ROOF NAIL | WOODY TOWNSEND | PASS | PM REQUEST | 5/2/2023 3:26:56 PM
wtownsend changed Inspection Type from ROOF FRAME/SHEATHING to ROOF NAIL
5/2/2023 4:13:45 PM
Dwelling addition.
|
|
06/29/2023 | 4-WAY ROUGH FRAME | RANDALL SMITH | PASS | 067478-01 - Scheduled by IVR. | 6/29/2023 4:52:25 PM
Ok to insulate
|
|
09/27/2023 | PGE ELECTRIC TAG | WOODY TOWNSEND | PASS | eTRAKiT Inspection Request | 9/25/2023 9:38:53 AM
9/25/2023 9:38 AM FULLER CONSTRUCTION
Early am if possible. Thanks
Contact Name: FULLER CONSTRUCTION
Site Address: 1229 MARIAN AVE
Phone: 5308280180
e-Mail: MFULLERCONSTRUCTION@YAHOO.COM
9/27/2023 3:17:57 PM
400 amp
|
|
04/02/2024 | ENV HEALTH RELEASE | PAUL THAO | PASS | | 7/22/2022 10:35:55 AM
Pending septic tank final for release.
4/2/2024 11:34:37 AM
Septic tank replacement finaled. Pass
|
|
04/02/2024 | CAL FIRE FINAL INSPE | CHRIS BOYD | PASS | | 4/2/2024 1:51:51 PM
Ok to final
|
|
06/05/2024 | PW FINAL | PWROADS | PASS | | 6/5/2024 9:15:16 AM
PASS PER R-2
|
|
06/05/2024 | **PERMIT FINAL | WOODY TOWNSEND | PASS | 071860-01 - Scheduled by IVR. | 3/29/2024 3:55:57 PM
Obtain Butte Fire, Health and Public Works final inspection approvals.
All that's pending to final.
9/6/2024 8:08:17 AM
ALL CONDITIONS HAVE BEEN MET TO FINAL PERMIT PER INSP NOTES
|
|