| CAL FIRE FINAL INSPE | CHRIS BOYD | | | |
|
07/14/2021 | FOUNDATION/FOOTINGS | ADAM KINGSLEY | FAIL | 053283-01 - Scheduled by IVR. | 7/14/2021 9:11:43 AM
Previous corrections (permit B20-2098) are completed except
WET 2/19/2021 4:31:34 PM
1. Completed
2. Install correct size anchor bolts( 3/4%34)at F2 spread footings and provide 12%34 embedment into first pour of footing for all bolts.
Added the following corrections
3. Underslab plumbing not under test. Provide hydrostatic test, minimum 10' head. System dry at time of reinspection.
4. Provide protection for PEX water supply pipes located under slab. Sleeve has deteriorated, pipe is exposed.
5. Provide minimum 3" clearance for reinforcement to earth. Rebar in contact and clearance not met several locations throughout.
6. Remove debris from footings, weeds, trash, dirt clods. Footings to bear upon undisturbed soil.
|
|
07/20/2021 | FOUNDATION/FOOTINGS | ADAM KINGSLEY | PASS | 053387-01 - Scheduled by IVR. | 7/20/2021 12:27:36 PM
Previous corrections are completed. Attached EOR letter for anchor embedment depth.
Setbacks, eufer ground also included.
|
|
07/20/2021 | UNDER SLAB PLUMBING | ADAM KINGSLEY | PASS | | |
|
06/06/2022 | ENV HEALTH RELEASE | PAUL THAO | PASS | | 5/25/2021 8:42:11 AM
Pending septic final for release.
6/6/2022 11:51:49 AM
The ADU/Shop has a 2 bedroom standalone septic system. Pass
|
|
05/17/2023 | 4-WAY ROUGH FRAME | RANDALL SMITH | FAIL | 066661-01 - Scheduled by IVR. | 5/17/2023 4:40:49 PM
Strap all DWV plumbing mid way up.
Fire chalk or foam all through penetrations at the top plate and through the ceiling.
Strengthen / repair pony wall in kitchen.
Install gfci on exterior main panel.
Update fire sprinkler plans to show actual installation.
Call for reinspection before covering.
Note owner provided photos of the 5/8 Sheetrock nailing on the exterior facing walls. Tagged 200@ mpu.
5/17/2023 4:41:30 PM
Strap all DWV plumbing mid way up.
Fire chalk or foam all through penetrations at the top plate and through the ceiling.
Strengthen / repair pony wall in kitchen.
Install gfci on exterior main panel.
Update fire sprinkler plans to show actual installation.
Call for reinspection before covering.
Note owner provided photos of the 5/8 Sheetrock nailing on the exterior facing walls. Tagged 200@ mpu.
5/17/2023 4:41:54 PM
Strap all DWV plumbing mid way up.
Fire chalk or foam all through penetrations at the top plate and through the ceiling.
Strengthen / repair pony wall in kitchen.
Install gfci on exterior main panel.
Update fire sprinkler plans to show actual installation.
Call for reinspection before covering.
Note owner provided photos of the 5/8 Sheetrock nailing on the exterior facing walls. Tagged 200@ mpu.
|
|
06/05/2023 | 4-WAY ROUGH FRAME | WOODY TOWNSEND | PASS | 067017-01 - Scheduled by IVR. | 6/5/2023 4:34:21 PM
Schedule shear nail inspection installed on interior prior to installation of gyp board.
|
|
06/15/2023 | SHEARWALL/B.W.P.-EXT | RAYMOND SANDOVAL | PASS | 067242-01 - Scheduled by IVR. | |
|
09/17/2024 | SHOWER PAN/TUB TEST | RICHARD PRATT | PASS | 074701-01 MSG! -Msg! Scheduled by IVR. | 9/17/2024 6:01:04 AM
rpratt changed Inspection Date/Time from 09/17/2024 08:00 AM to 09/17/2024 12:00 PM
9/17/2024 1:58:32 PM
Shower pan drain test - Approved
|
|
05/01/2025 | **PERMIT FINAL | WOODY TOWNSEND | FAIL | 078231-01 - Scheduled by IVR. | 5/1/2025 4:29:39 PM
Contact Cal Fire and Public Works NPDES for final inspection approvals.
|
|
| NPDES | KIM HUNTER | | | |
|